Problem

Fatigue test data are required in an engineering design for N = 103 cycles, N = 105 cycles...

Fatigue test data are required in an engineering design for N = 103 cycles, N = 105 cycles, and N = 107 cycles. Calculate the time required by the tests in hours (or days) for frequencies of

a. 1 Hz (test speeds of pioneers in fatigue testing)


b. 35 Hz (approximate speeds of most modem test machines)


c. 160 Hz (high-speed test machines)

Note: The majority of conventional high cycle fatigue tests are conducted in the frequency range of 30-300 Hz (Curbishley, 1988).

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 16