Manufacturing overhead — over/underapplied Checker, Inc., produces automobile bumpers. Overhead is applied on the basis of machine hours required for cutting and fabricating. A predetermined overhead application rate of $18.50 per machine hour was established for 2010.
Required:
a.If 12,000 machine hours were expected to be used during 2010, how much overhead was expected to be incurred?
b. Actual overhead incurred during 2010 totaled $229,400, and 12,200 machine hours were used during 2010. Calculate the amount of over- or underapplied overhead for 2010.
c. Explain the accounting necessary for the over- or underapplied overhead for the year.