Contiguous bored piles are constructed using
a. structural steel sections.
b. site-cast reinforced concrete.
c. precast concrete.
d. precast, prestressed concrete.
e. none of the above.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.