Blocking between floor joists is required where
a. the joists bear on a wall.
b. the joists bear on a beam.
c. the joists are hung on a beam using joist hangers.
d. all of the above.
e. both (a) and (b).
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.