Problem

Rework Problem 10-16 with the assumption that the chlorine contact chamber is followed b...

Rework Problem 10-16 with the assumption that the chlorine contact chamber is followed by a distribution pipe that can be used as a contact chamber. It is a straight pipe 300 mm in diameter, and it has no service connections for 1.0 km. Assume t10/t0 = 1.0 for the pipe.

Problem 10-16

Design a longitudinal-serpentine chlorine contact chamber for a design flow of 38,400 m3/d. The required t10 to achieve a Ct of 165 is 82.8 min. Assume that Figure 10-12 applies and that the design criterion is a performance t10/t0 = 0.8. Use H = 3 W for the height estimate.

Figure 10-12

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 10