Rework Problem 10-16 with the assumption that the chlorine contact chamber is followed by a distribution pipe that can be used as a contact chamber. It is a straight pipe 300 mm in diameter, and it has no service connections for 1.0 km. Assume t10/t0 = 1.0 for the pipe.
Problem 10-16
Design a longitudinal-serpentine chlorine contact chamber for a design flow of 38,400 m3/d. The required t10 to achieve a Ct of 165 is 82.8 min. Assume that Figure 10-12 applies and that the design criterion is a performance t10/t0 = 0.8. Use H = 3 W for the height estimate.
Figure 10-12
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.