In order to wire a post light, a homeowner purchased some single-conductor cable that was marked as suitable for direct burial in the ground. A separate equipment grounding conductor to the post light was not carried. Instead, the bottom of the metal post, buried 2 ft (0.6 m) into the ground, was used as a ground for the post light. The inspector “red tagged” (turned down) the installation. Who is right—the homeowner or the electrical inspector? Explain.
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.