A 10-in thick, 26-foot wide concrete pavement is to be placed with a slipform paver using...

A 10-in thick, 26-foot wide concrete pavement is to be placed with a slipform paver using 8-cy batches mixed at a central mix plant.  Each batch is mixed for an average of 1.9 min and the plant is 75% efficient. Plant production matches paver production. Paver production is 85% efficient.  Truck cycle time is 50 min.  Hourly rates:

Equipment

Labor

Paver, $185

Foreman, $43

Texture Bar, $30

3 Operators, $33 each

Tine Bar, $30

9 Laborers, $28 each

Water Truck, $18

2 Finishers, $41 each

2 Pickups, $11 each

Truck driver, $29 each

Haul Truck, $36 each

 

Concrete materials cost $42.50/cy, batching cost is $9.00/cy, and incidentals cost $8.32/cy. Overhead and profit is 28% of the previous costs.  Add an additional truck to balanced number.

Find (a) number of trucks, (b) paver speed, (c) $/cy cost, and (d) $/sy cost.

Plant production = 8 cy

1.9 min

75 efficiency

189.5 cy/hr

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 16