Which one of the following tasks would not be an element of engineering hydrology? (a) Evaluate the effect of the size (capacity) of the outlet from a reservoir on recreation facilities at the reservoir site; (b) estimate the size of a pipe that would be required to carry floodwater under a highway; (c) evaluate the effect of water supply on the distribution and movement of people in the United States; (d) estimate the rates of storm runoff from rooftops.