Riverside Engineering is a machine shop that uses job order costing. Overhead is applied to individual jobs at a predetermined rate based on direct labor costs. The job cost sheet for job no. 321 appears below.
JOB COST SHEET | |
JOB NUMBER:321 | DATE STARTED: May 10 |
PRODUCT: 2’’Brass Check Valves | DATE COMPLETED: May 21 |
UNITS COMPLETED:4,000 |
|
Direct materials used | $ 7,720 |
Direct labour | 1,400 |
Manufacturing overhead applied | 3,080 |
Total cost of job no 321 | $12,200 |
Unit cost ($12,200 -r- 4,000 units) | $3.05 |
Prepare general journal entries to:
a. Summarize the manufacturing costs charged to job no. 321. (Use one compound entry.)
b. Record the completion of job no. 321.
c.Record the credit Sale of2,100 units job no. 321 at a unit sales price of $5. Record ina separate entry the related cost of goods sold.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.