PRODUCTIONCOST At a certain factory, approximately q(t) = t2+50tunits are manufactured during the first t hours of a production run, and the total cost of manufacturing qunits is C(q) = 0.1q2+ 10q + 400 dollars. Find the rate at which the manufacturing cost is changing with respect to time 2 hours after production commences.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.