A sand layer of the cross-sectional area shown in Fig. 1 has been determined to exist for a 500-m length of the levee. The hydraulic conductivity of the sand layer is 3 m/day. Determine the quantity of water which flows into the ditch in m3/min.
Figure 1
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.