The design for urban irrigation is based on the data in the following table. Determine the area required to distribute wastewater and the storage requirements. {Hint: Size the storage reservoir to be empty on October 1.)
Month | Wastewater Flow (mgd) | Precipitation (in./month) | Evaporation (in./month) | Irrigation Requirements (in./ac/wk) |
Jan | 3.05 | 4 | 2 | 0 |
Feb | 4.5 | 6 | 1.8 | 0 |
Mar | 3.15 | 4 | 2.3 | 0 |
April | 2.46 | 2 | 6 | 2.5 |
May | 2.51 | 1 | 8 | 3 |
June | 1.87 | 0 | 10 | 4 |
July | 1.76 | 0 | 12 | 4 |
Aug | 1.75 | 0 | 12 | 4 |
Sept | 1.7 | 0 | 12 | 4 |
Oct | 1.62 | 2 | 7 | 3 |
Nov | 1.64 | 2 | 6 | 0 |
Dec | 2.25 | 3 | 3 | 0 |
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.