Determine the elevation of the upstream reservoir (A) in Figure P4.1.2 if the downstream reservoir (B) is at 750 m, the flow rate (water at 20°C) through the smooth concrete pipeline is 1.2 m3/sec, given the following:
pipes 1 and 2: 100 m long (D = 0.5 m) | valves 1-2: fully open globe valve |
expansion 2-3: D = 0.5 m to 1.0 m | pipe 3: 100 mlong (D = 1.0 m) |
confusor 4: loss coefficient of 0.3 | pipe 5: 50 mlong (D = 0.5 m) |
bend 5-6: loss coefficient of 0.2 | pipe 6: 50 mlong (D = 0.5 m) |