A storm event occurred on Falls Creek Watershed that produced a rainfall pattern of 5 cm/h...

A storm event occurred on Falls Creek Watershed that produced a rainfall pattern of 5 cm/hr for the first 10 min, 10 cm/hr in the second 10 min, and 5 cm/hr in the next 10 min. The watershed is divided into three subbasins (see Figure), with the unit hydrographs given in the following table. Subbasins A and B had a loss rate of 2.5 cm/hr for the first 10 min and 1.0 cm/hr thereafter. Subbasin C had a loss rate of 1.0 cm/hr for the first 10 min and 0 cm/hr thereafter. Using a simple lag routing method (time shift the hydrograph by K), determine the storm hydrograph at point 2. Assume a lag time K of 30 min.

Figure

10-Minute Unit Hydrographs

Subbasin A

 

Subbasin B

 

Subbcsin C

 

Time (min)

Q (m3/s)

Time (min)

Q (m3/s)

Time (min)

Q (m3/s)

0

0

0

0

0

0

10

5

10

5

10

16 7

20

10

20

10

20

33.4

30

15

30

15

30

50 0

40

20

40

20

40

33.4

50

25

50

25

50

16 7

60

20

60

20

60

0

70

15

70

15

 

 

80

10

80

10

 

 

90

5

90

5

 

 

100

0

100

0

 

 

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 4