A construction company is investigating two forming options for a new hotel project. Option A is the use of large-panel forms for the walls and table forms for the slabs. Option B is tunnel forms for walls and slabs. In both cases the equipment is to be rented, for the total area of 2000 sf of walls and 2000 sf of slabs. Overall, 160,000 sf of walls and 160,000 sf of slabs will be formed. Costs, labor productivity, and work durations are as follows: