Estimate the time of concentration for shallow sheet (low on a 1,280-ft section of asphalt roadway ata slopte of 2.5%. Assume a 5-yr design frequency and the IDF curve of Figure 4.4.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.