Problem

Determining job cost, using direct labor cost, direct labor hour, and machine hour metho...

Determining job cost, using direct labor cost, direct labor hour, and machine hour methods

a. If the direct labor cost method is used in applying factory overhead and the predetermined rate is 100%, what amount should be charged to Job 2010 for factory overhead? Assume that direct materials used totaled $5,000 and that the direct labor cost totaled $3,200.

b. If the direct labor hour method is used in applying factory overhead and the predetermined rate is $10 an hour, what amount should be charged to Job 2010 for factory overhead? Assume that the direct materials used totaled $5,000, the direct labor cost totaled $3,200, and the number of direct labor hours totaled 250.

c. If the machine hour method is used in applying factory overhead and the predetermined rate is $12.50 an hour, what amount should be charged to Job 2010 for factory overhead? Assume that the direct materials used totaled $5,000, the direct labor cost totaled $3,200, the direct labor hours were 250 hours, and the machine hours were 295 hours.

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search