A public works department is to construct a new road between towns A and B. Town A lies on an abandoned road running east–west. Town B lies20 miles north of this road and 40 miles east of town A. An engineer proposes that the road be constructed by restoring a section of the old road leaving town A and joining it to an entirely new section of road at a point to be determined, connecting that point with town B (see the figure).

a. If the cost of restoring the old road is $200,000 per mile and the cost of new construction is $400,000 per mile, determine the function describing the total cost.

b. Estimate how much of the old road should be restored in order to minimize the department’s cost.

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search