Another part of the output of Exercise 11.30 is shown here.
a. Predict the mean total direct cost for all bumper sticker orders with a print run of 2,000 stickers (that is, with Runsize = 2.0).
b. Locate a 95% confidence interval for this mean.
REFERENCE:
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.