Problem

Solve problem. See EXAMPLE.Pollution in a River Two chemical plants are polluting a river....

Solve problem. See EXAMPLE.

Pollution in a River Two chemical plants are polluting a river. If plant A produces a predetermined maximum amount of pollutant twice as fast as plant B, and together they produce the maximum pollutant in 26 hr, how long will it take plant B alone?

 

 

 

Part of Job

 

Rate

Time

Accomplished

Pollution from A

26

Pollution from B

 

26

 