Problem

Activity-Based Costing Miami Valley Architects Inc. provides a wide range of engineering a...

Activity-Based Costing Miami Valley Architects Inc. provides a wide range of engineering and architectural consulting services through its three branch offices in Columbus, Cincinnati, and Dayton, Ohio. The company allocates resources and bonuses to the three branches based on the net income of the period. The results of the firm’s performance for the year 2016 follows ($ in thousands):

Miami Valley accumulates overhead items in one overhead pool and allocates it to the branches based on direct labor dollars. For 2016, this predetermined overhead rate was $1.859 for every direct labor dollar incurred by an office. The overhead pool includes rent, depreciation, and taxes, regardless of which office incurred the expense. Some branch managers complain that the overhead allocation method forces them to absorb a portion of the overhead incurred by the other offices.

Management is concerned with the 2016 operating results. During a review of overhead expenses, management noticed that many overhead items were clearly not correlated to the movement in direct labor dollars as previously assumed. Management decided that applying overhead based on activity-based costing and direct tracing wherever possible should provide a more accurate picture of the profitability of each branch.

An analysis of the overhead revealed that the following dollars for rent, utilities, depreciation, and taxes could be traced directly to the office that incurred the overhead ($ in thousands):

Activity pools and their corresponding cost drivers were determined from the accounting records and staff surveys as follows:

Required (Round all answers to thousands)

1. What overhead costs should be assigned to each branch based on ABC concepts?


2. What is the contribution of each branch before subtracting the results obtained in requirement 1?


3. What is the profitability of each branch office using ABC?


4. Evaluate the concerns of management regarding the volume-based cost technique currently used.

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search