Problem

A storm causes a peak runoff rate of 8 m3/s in a drainage basin that has a time of concent...

A storm causes a peak runoff rate of 8 m3/s in a drainage basin that has a time of concentration of 20 min. A detention basin with 12,000 m3 of storage volume is built on site. Estimate the peak outflow rate from the basin for this storm, using the simplified storage factor method.

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search