Problem

In water-resources engineering, the sizing of reser­voirs depends on accurate estimates of...

In water-resources engineering, the sizing of reser­voirs depends on accurate estimates of water flow in the river that is being impounded. For some rivers, long-term historical records of such flow data are difficult to obtain. In contrast, meteorological data on precipitation is often avail­able for many years past. Therefore, it is often useful to

determine a relationship between flow and precipitation. This relationship can then be used to estimate flows for years when only precipitation measurements were made. The following data is available for a river that is to be dammed:

Precipitation,cm

88.9

108.5

104.1

139.7

127 94

116.8

99.1

 

Flow,m3/s

14.6

16.7

15.3

23.2

19.5

16.1

18.1

16.6

(a) Plot the data.


(b) Fit a straight line to the data with linear regression. Superimpose this line on your plot.


(c) Use the best-fit line to predict the annual water flow if the precipitation is 120 cm.


(d) If the drainage area is 1100 km2, estimate what fraction of the precipitation is lost via processes such as evapo­ration, deep groundwater infiltration, and consumptive use.

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 13