Using typical design parameters, design a postaeration cascade for the town of Bath (Problem 16-38, Chapter 16). To meet regulatory requirements, the DO must be ≥ 5.0 mg/L. Assume that the SBR plant is using post-SBR equalization, that the effluent DO is 2.0 mg/L, and that the maximum sustained temperature is 21oC.
Problem 16-38
Estimate the volume and dimensions of an SBR for the town of Bath using the following design data:
Example 16-13.
Estimate the volume and dimensions of an SBR for the town of Quintuple using the following design data:
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.