You are given the following environmental quality-related costs: Employee training Product design Supplier certification Process inspection...
You are given the following environmental quality-related costs: Employee training Product design Supplier certification Process inspection Depreciation-pollution-control equipment Maintain pollution-control equipment Clean up polluted lake Restore land after use Property damage claim $ 160,000 200,000 70, 800 350,000 460,000 260,000 560,000 760,000 660,000 Required: 1. Prepare a cost-of-quality (COQ) report of environmental management for the year. Determine subtotals for each of the four reporting categories, and express each subtotal as a percentage of total operating expenses ($10,000,000) for the year....
You are given the following environmental quality-related costs: Employee training $ 160,000 Product design 200,000 Supplier certification 70,000 Process inspection 350,000 Depreciation—pollution-control equipment 460,000 Maintain pollution-control equipment 260,000 Clean up polluted lake 560,000 Restore land after use 760,000 Property damage claim 660,000 Required: 1. Prepare a cost-of-quality (COQ) report of environmental management for the year. Determine subtotals for each of the four reporting categories, and express each subtotal as a percentage of total operating expenses ($10,000,000) for the year. (Hint:...
You are given the following environmental quality-related costs: Employee training $ 110,000 Product design 150,000 Supplier certification 45,000 Process inspection 325,000 Depreciation—pollution-control equipment 410,000 Maintain pollution-control equipment 210,000 Clean up polluted lake 510,000 Restore land after use 710,000 Property damage claim 610,000 Required: 1. Prepare a cost-of-quality (COQ) report of environmental management for the year. Determine subtotals for each of the four reporting categories, and express each subtotal as a percentage of total operating expenses ($10,000,000) for the year. (Hint:...
You are given the following environmental quality-related costs: Employee training $ 150,000 Product design 190,000 Supplier certification 65,000 Process inspection 345,000 Depreciation—pollution-control equipment 450,000 Maintain pollution-control equipment 250,000 Clean up polluted lake 550,000 Restore land after use 750,000 Property damage claim 650,000 Required: 1. Prepare a cost-of-quality (COQ) report of environmental management for the year. Determine subtotals for each of the four reporting categories, and express each subtotal as a percentage of total operating expenses ($10,000,000) for the year. (Hint:...
Environmental Cost Report Verde Company reported operating costs of $43,000,000 as of December 31, 20x5, with the following environmental costs: Testing for contamination $ 989,000 Inspecting products 430,000 Treating toxic waste 1,548,000 Obtaining ISO 14001 certification 731,000 Designing processes 688,000 Cleaning up oil spills 2,967,000 Maintaining pollution equipment 1,118,000 Cleaning up contaminated soil 5,160,000 Required: 1. Prepare an environmental cost report, classifying costs by quality category and expressing each as a percentage of total operating costs. Round percentages to two...
Verde Company reported operating costs of $37,000,000 as of December 31, 20x5, with the following environmental costs: Testing for contamination $ 518,000 Inspecting products 592,000 Treating toxic waste 1,739,000 Obtaining ISO 14001 certification 962,000 Designing processes 629,000 Cleaning up oil spills 2,516,000 Maintaining pollution equipment 481,000 Cleaning up contaminated soil 4,625,000 Required: 1. Prepare an environmental cost report, classifying costs by quality category and expressing each as a percentage of total operating costs. Round percentages to two decimal places, if...
Long-Term Performance Report Nabors Company had actual quality costs for the year ended June 30, 20x5, as given below. Prevention costs: Prototype inspection $ 380,000 Vendor certification 760,000 Total prevention costs $ 1,140,000 Appraisal costs: Process acceptance $ 395,000 Test labor 440,000 Total Appraisal costs $ 835,000 Internal failure costs: Retesting $ 227,500 Rework 455,000 Total internal failure costs $ 682,500 External failure costs: Recalls $ 232,000 Product liability 462,500 Total external failure costs $ 694,500 Total quality costs $3,352,000...
Interim Quality Performance Report Davis, Inc., had the following quality costs for the years ended December 31, 2014 and 2015: 2014 2015 Prevention costs: Quality audits $62,000 $93,000 Vendor certification 126,500 189,750 Appraisal costs: Product acceptance $86,000 $129,000 Process acceptance 95,000 105,000 Internal failure costs: Retesting $90,000 $88,000 Rework 173,000 230,000 External failure costs: Recalls $130,000 $104,000 Warranty 310,000 318,000 At the end of 2014, management decided to increase its investment in control costs by 50 percent for each category’s...
Nabors Company had actual quality costs for the year ended June 30,20x5, as given below. Prevention costs: $ 350,000 Prototype inspection Vendor certification 700,000 $ 1,050.000 Total prevention costs Appraisal costs: Process acceptance $365,000 Test labor 410,000 Total Appraisal costs $ 775.000 Internal failure costs: Retesting $ 212,500 Rework 425,000 Total internal failure costs $ 637.500 External failure costs: Recalls $ 227.250 Product liability 515,750 Total external failure costs $ 743,000 Total quality costs $3,205,500 At the zero-defect state, Nabors...
Interim Quality Performance Report Davis, Inc., had the following quality costs for the years ended December 31, 20x4 and 20x5: 20x4 20x5 Prevention costs: Quality audits $60,000 $90,000 Vendor certification 119,500 179,250 Appraisal costs: Product acceptance $90,000 $135,000 Process acceptance 91,000 102,500 Internal failure costs: Retesting $96,000 $86,000 Rework 200,000 176,000 External failure costs: Recalls $142,500 $114,000 Warranty 330,000 314,000 At the end of 20x4, management decided to increase its investment in control costs by 50 percent for each category’s...