Exercise 8-10 Every year Swifty Industries manufactures 8,600 units of part 231 for use in its production cycle. The per unit costs of part 231 are as follows: $ 4 10 Direct materials Direct labor Variable manufacturing overhead Fixed manufacturing overhead Total 10 Flintrock, Inc., has offered to sell 8,600 units of part 231 to Swifty for $33 per unit. If Swifty accepts Flintrock's offer, its freed-up facilities could be used to earn $14,400 in contribution margin by manufacturing part...
Exercise 8-10 Every year Riverbed Industries manufactures 7,300 units of part 231 for use in its production cycle. The per unit costs of part 231 are as follows: $ 5 11 Direct materials Direct labor Variable manufacturing overhead Fixed manufacturing overhead 10 Total $32 Flintrock, Inc., has offered to sell 7,300 units of part 231 to Riverbed for $34 per unit. If Riverbed accepts Flintrock's offer, its freed-up facilities could be used to earn $10,500 in contribution margin by manufacturing...
Please read carefully, I've uploaded this twice and gotten the wrong answer both times. Thank you Exercise 8-10 Every year Bramble Industries manufactures 9,900 units of part 231 for use in its production cycle. The per unit costs of part 231 are as follows: $ 5 12 Direct materials Direct labor Variable manufacturing overhead Fixed manufacturing overhead Total 10 Flintrock, Inc., has offered to sell 9,900 units of part 231 to Bramble for $33 per unit. If Bramble accepts Flintrock's...
The previous person answered this with the net to make at 189,000 and it was incorrect, if you know the correct answer for the "Total Relevant Cost to Make" please respond, as it is not 189,000 Exercise 8-10 Every year Ayayai Industries manufactures 7,900 units of part 231 for use in its production cycle. The per unit costs of part 231 are as follows: Direct materials $3 Direct labor 11 Variable manufacturing overhead 6 Fixed manufacturing overhead 10 Total $30...
Exercise 8-8 The Swirty Company manufactures 1.420 units of a part that could be purchased from an outside supplier for $12 each. Swifty's costs to manufacture each part are as follows: $2 Direct materials Direct labor Variable manufacturing overhead Fixed manufacturing overhead Total 3 All fixed overhead is unavoidable and is allocated based on direct labor. The facilities that are used to manufacture the part have no alternative uses. (a) Calculate relevant cost to make. Relevent cost to make $...
Royal Company manufactures 10,000 units of Part R-3 each year. At this level of activity, the cost per unit for Part R-3 follows: Direct materials $14.40 Direct labour 21.00 Variable manufacturing overhead 9.60 Fixed manufacturing overhead 25.00 Total cost per part $70.00 An outside supplier has offered to sell 10,000 units of Part R-3 each year to Royal Company for $54 per part. If Royal Company accepts this offer, the facilities now being used to manufacture Part R-3 could be...
Problem 8-24 (Part Level Submission) Wildhorse Water Co. is a leading producer of greenhouse irrigation systems. Currently, the company manufactures the timer unit used in each of its systems. Based on an annual production of 40,960 timers, the company has calculated the following unit costs. Direct fixed costs include supervisory and clerical salaries and equipment depreciation. Direct materials $12 Direct labor 7 Variable manufacturing overhead 4 Direct fixed manufacturing overhead 9 (30% salaries, 70% depreciation) Allocated fixed manufacturing overhead 5...
Problem 8-24 (Part Level Submission) Oriole Water Co. is a leading producer of greenhouse irrigation systems. Currently, the company manufactures the timer unit used in each of its systems. Based on an annual production of 40,620 timers, the company has calculated the following unit costs. Direct fixed costs include supervisory and clerical salaries and equipment depreciation. Direct materials $12. 6 3 Direct labor Variable manufacturing overhead Direct fixed manufacturing overhead Allocated fixed manufacturing overhead Total unit cost 10 (30% salaries,...
Han Products manufactures 25,000 units of part S-6 each year for use on its production line. At this level of activity, the cost per unit for part S-6 is: 4,70 Direct materials Direct labor 8.00 3.40 Variable manufacturing overhead Fixed manufacturing overhead 15.00 $31.10 Total cost per part An outside supplier has offered to sell 25,000 units of part S-6 each year to Han Products for $50.00 per part. If Han Products accepts this offer, the facilities now being used...
Han Products manufactures 16,000 units of part S-6 each year for use on its production line. At this level of activity, the cost per unit for part S-6 is: Direct materials $ 4.10 Direct labor 6.00 Variable manufacturing overhead 2.50 Fixed manufacturing overhead 15.00 Total cost per part $ 27.60 An outside supplier has offered to sell 16,000 units of part S-6 each year to Han Products for $43.00 per part. If Han Products accepts this offer, the...