Pleaseee i need helppp DISCUSSION BOARD going to use for help mdc 2071 11-14 Labor costs...

Pleaseee i need helppp

DISCUSSION BOARD going to use for help mdc 2071 11-14

Labor costs of an auto repair mechanic are seldom based on actual hours worked. Instead, this labor cost is based on an industry average of time estimated to complete a repair job. This means a customer can pay, for example, $120 for two hours of work on a car when the actual time worked was only one hour. Many experienced mechanics can complete repair jobs faster than the industry average. Assume that you are asked to complete such a survey for a repair center. The survey calls for objective input, and many questions require detailed cost data and analysis. The mechanics and owners know you have the survey and encourage you to complete it in a way that increases the average billable hours for repair work.

Required

  1. Write a one-page memorandum to the mechanics and owners that describes the direct labor analysis you will undertake in completing this survey.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Given Data:

Given that labor costs of an auto repair mechanic are seldom based on actual hours worked.

This means a customer can pay for example $120 for two hours of work on a car when the actual time worked was only hour.

The memorandum for describing the direct labor analysis is as under.

To  

The Members and employees

Subject: Describing the direct labor analysis

Respected Members

The labor cost paid by the company is based on the average time estimated by the company which is 2 hours.

Whereas the actual time taken for repair an auto a 1 hours and even faster than that.

The company bills the customer for 2 hours whereas the actual times taken by the labour are much less than that which increases the cost to the customers.

Therefore the company should pay the worker for the actual hours taken for repair and also will the customer on the basis of the actual hours taken.

By billing the customers at the actual hours basis the company will also reduce the cost of the company and the customer satisfaction will also be increased.

Actually there are three methods to estimate cost based on previous data . Scatter diagram,high low method and least square regression method.

Of the three methods least square method yeilds the most precise estimated of cost behaviour .It is a statistical and spread sheet method with the help of connecting data points it estimates precisely.

Add a comment
Know the answer?
Add Answer to:
Pleaseee i need helppp DISCUSSION BOARD going to use for help mdc 2071 11-14 Labor costs...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • DQ 1: Labor costs of an auto repair mechanic are seldom based on actual hours worked....

    DQ 1: Labor costs of an auto repair mechanic are seldom based on actual hours worked. Instead, this labor cost is based on an industry average of time estimated to complete a repair job. This means a customer can pay, for example, $120 for two hours of work on a car when the actual time worked was only one hour. Many experienced mechanics can complete repair jobs faster than the industry average. Assume that you are asked to complete such...

  • This is my question but i only need help with step 5 and 6,7,8 and that's...

    This is my question but i only need help with step 5 and 6,7,8 and that's all. Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue...

  • Solve question 1 of P10-9 Standard Costs and Variances Santiago was shocked to see the loss...

    Solve question 1 of P10-9 Standard Costs and Variances Santiago was shocked to see the loss for the month particularly because sales were exactly eted. He stated, "I sure hope the plant has a standard cost system in oration. If it doesn't have the slightest idea of where to start looking for the problem." he plant does use a standard cost system, with the following standard variable cost per impot T Standard Quantity or Hours Standard Price or Rate Standard...

  • THE COMPANY: MORE POWER, INC. More Power, Inc., is a large, local retail store specializing in...

    THE COMPANY: MORE POWER, INC. More Power, Inc., is a large, local retail store specializing in the sale and service of hardware, tools, lawn and garden implements, and other materials for the home. More Power operates seven days a week, dawn to dusk. Approximately 120 employees work in distinct divisions within the store, including customer service/return desk; warehouse and delivery; service and repair; and three distinct sections focused on (1) hardware and tools, (2) lawn and garden and outdoors, and...

  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT