• Describe the narcotic schedule (Schedule I-IV). What criteria are used to determine how a narcotic is classified on the schedule?
Ans) List of Schedule IV drugs as defined by the United States Controlled Substances Act.[1] The following findings are required for drugs to be placed in this schedule:
- The drug or other substance has a low potential for abuse relative to the drugs or other substances in schedule III.
- The drug or other substance has a currently accepted medical use in treatment in the United States.
- Abuse of the drug or other substance may lead to limited physical dependence or psychological dependence relative to the drugs or other substances in schedule III.
- The complete list of Schedule IV drugs follows. The Administrative Controlled Substances Code Number for each drug is included.
Narcotics:
ACSCN Drug
9167 Not more than 1 milligram of difenoxin and not less than 25 micrograms of atropine sulfate per dosage unit
9278 Dextropropoxyphene
9752 Tramadol
• Describe the narcotic schedule (Schedule I-IV). What criteria are used to determine how a narcotic...
What criteria are used to determine if an injury or illness is classified as a "restricted work case".
Describe how a researcher determines the sampling criteria (inclusion and exclusion criteria) for a study.
In the development of a system, what criteria should be used to determine where one phase begins and another ends and where overlap can occur?
48. What is the role of the medical assistant with IV therapy? a. Schedule appointments for the patient. Assist the nurse by communicating issues with the Iv c. Start IVs and give IV medications and fluids d. All of the above c. A and B What is an crror in the air lock technique? a. Can be used for all injection routes. b. Add 0.5 to 0.7 ml of air into the syringe. Add th d. 49. c. e air...
1. Describe two methods that can be used to determine the critical path of a project schedule. 2. If an activity on the critical path falls behind schedule, what effect will this have on the entire project? 3. Describe the relationship between a predecessor project activity and a successor project activity. management. 4. Using the enumeration method, explain how a project critical path can be determined. Support your response with an illustrative chart.
Strategic business management: describe the criteria that Boards of Directors have successfully used to manage the executive succession process.
Describe the various financial statements that might be used in a medical facility to determine how business is going. What factors might a manager look at?
How do I know if a solution will be a buffer? What are the criteria? Does the concentration matter? For example: Which of the following will be a buffer? i)0.1M NaOH and 0.1M HBr ii)0.2M HCl and 0.4M NaF iii) 0.1M NH3 and 0.2M NH4Cl Answer ii) and iii) I understand why iii) works but why does ii) work too?
1. How do you do the calculation for heparin IV administration? -I need to determine the rate -including patients weight of 71KG
What criteria are used to grade the different levels of evidence?