At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production engineering cost is $803,530 and its total fixed production engineering cost is $161,280. What would be the total production engineering cost per unit, both fixed and variable, at an activity level of 9,600 machine-hours in a month? Assume that this level of activity is within the relevant range. (Do not round intermediate calculations.) |
Variable cost per unit= $803530/9100= $88.30
Fixed cost per unit= $161280/9600= $16.80
Total production engineering cost per unit= Variable cost per unit+Fixed cost per unit
= $88.30+16.80= $105.10
At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production engineering...
5. At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production engineering cost is $803,530 and its total fixed production engineering cost is $161,280. What would be the total production engineering cost per unit, both fixed and variable, at an activity level of 9,600 machine-hours in a month? Assume that this level of activity is within the relevant range. (Do not round intermediate calculations.)
At an activity level of 9,200 machine-hours in a month, Falks Corporation's total variable production engineering cost is $825,240 and its total fixed production engineering cost is $249,100. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 9,400 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)
At an activity level of 8,500 machine-hours in a month, Falks Corporation's total variable production engineering cost is $708,900 and its total fixed production engineering cost is $168,210. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 8,900 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)
At an activity level of 9,900 machine-hours in a month, Falks Corporation's total variable production engineering cost is $882,090 and its total fixed production engineering cost is $196,000. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 10,000 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.) Multiple Choice $107.81 $108.88 $108.70 $108.35
At an activity level of 9,500 machine-hours in a month, Falks Corporation’s total variable production engineering cost is $779,950 and its total fixed production engineering cost is $200,970. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 9,900 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)
TB MC Qu. 1-133 At an activity level of.. A n activity level of 9.00 machine hours in a month, Fakes Corporation's total variable production engineering cost is $765,310 and is totalfied production engineering costs 5224070 What would be the total production engineering Couper machine hour, both fixed and variablet an activity level of 9700 machine hours in a month Assume that this level of activity within the relevant range. Round Intermediate calculations to 2 decimal places.) Maple Choice O...
At an activity level of 4,400 units in a month, Goldbach Corporation's total variable maintenance and repair cost is \$31 and Its totalfixed maintenance and repair cost is \$93,104 . What would be the total maintenance and repair cost, both fixed and variable , at an activity level of 4,600 units in a month ? Assume that this level of activity is within the relevant range.
Crosshill Company’s total overhead costs at various levels of activity are presented below: Month Machine-Hours Total Overhead Cost April 54,000 $188,180 May 44,000 $163,980 June 64,000 $212,380 July 74,000 $236,580 Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 44,000-machine-hour level of activity in May is as follows: Utilities (variable) $ 52,800 Supervisory salaries (fixed) 44,000 Maintenance (mixed) 67,180 Total overhead cost $ 163,980 The...
Crosshill Company’s total overhead costs at various levels of activity are presented below: Month Machine-Hours Total Overhead Cost April 54,000 $188,180 May 44,000 $163,980 June 64,000 $212,380 July 74,000 $236,580 Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 44,000-machine-hour level of activity in May is as follows: Utilities (variable) $ 52,800 Supervisory salaries (fixed) 44,000 Maintenance (mixed) 67,180 Total overhead cost $ 163,980 The...
Nova Company’s total overhead cost at various levels of activity are presented below: Month Machine-Hours Total Overhead Cost April 52,000 $192,320 May 42,000 $166,720 June 62,000 $217,920 July 72,000 $243,520 Assume that the total overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 42,000 machine-hour level of activity is: Utilities (variable) $ 58,800 Supervisory salaries (fixed) 43,000 Maintenance (mixed) 64,920 Total overhead cost $...