Option C is the correct answer
HIT THE LIKE BUTTON
TB MC Qu. 1-133 At an activity level of.. A n activity level of 9.00 machine...
At an activity level of 9,200 machine-hours in a month, Falks Corporation's total variable production engineering cost is $825,240 and its total fixed production engineering cost is $249,100. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 9,400 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)
At an activity level of 8,500 machine-hours in a month, Falks Corporation's total variable production engineering cost is $708,900 and its total fixed production engineering cost is $168,210. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 8,900 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)
At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production engineering cost is $803,530 and its total fixed production engineering cost is $161,280. What would be the total production engineering cost per unit, both fixed and variable, at an activity level of 9,600 machine-hours in a month? Assume that this level of activity is within the relevant range. (Do not round intermediate calculations.)
5. At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production engineering cost is $803,530 and its total fixed production engineering cost is $161,280. What would be the total production engineering cost per unit, both fixed and variable, at an activity level of 9,600 machine-hours in a month? Assume that this level of activity is within the relevant range. (Do not round intermediate calculations.)
At an activity level of 9,900 machine-hours in a month, Falks Corporation's total variable production engineering cost is $882,090 and its total fixed production engineering cost is $196,000. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 10,000 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.) Multiple Choice $107.81 $108.88 $108.70 $108.35
At an activity level of 9,500 machine-hours in a month, Falks Corporation’s total variable production engineering cost is $779,950 and its total fixed production engineering cost is $200,970. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 9,900 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)
TB MC Qu. 2-133 Lupo Corporation uses a job-order costing ... 13 Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine hours. The company based its predetermined overhead rate for the current year on the following data: 303 points 8 023525 Total machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine-hour 32,300 $581,400 $ 2 Print Recently, Job T687 was completed with the following characteristics 10 40 Number of units...
TB MC Qu. 2-133 (Algo) Lupo Corporation uses a job-order... Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine-hour Recently, Job T687 was completed with the following characteristics: 30,400 $425,600 $ 5 10 Number of units in the job Total machine-hours Direct materials Direct labor...
TB MC Qu. 5-46 The Macon Company uses the high-low... The Macon Company uses the high-low method to determine its cost equation. The following information was gathered for the past year: Machine Hours 20,000 8,000 Busiest month (June) Slowest month (December) Direct Labor Costs $250,000 $ 127,000 If Macon expects to use 14,500 machine hours next month, what are the estimated direct labor costs? O $172,000. O $179,125. $193,625. $148,625. O The Missou Manufacturing Company recorded overhead costs of $14,202...
TB MC Qu. 7-67 Feldpausch Corporation has provided the following... Feldpausch Corporation has provided the following data from its activity-based costing system Activity Cost Pool Assembly Processing orders Total Cost Total Activity $1,137,360 84,000 machine-hours $ 28,479 1,100 orders inspection- $ 97,155 1,270 hours Inspection The company makes 470 units of product W268 a year, requiring a total of 660 machine-hours, 50 orders, and 40 inspection-hours per year. The product's direct materials cost is $40.30 per unit and its direct...