Question

At an activity level of 9,500 machine-hours in a month, Falks Corporation’s total variable production engineering...

At an activity level of 9,500 machine-hours in a month, Falks Corporation’s total variable production engineering cost is $779,950 and its total fixed production engineering cost is $200,970. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 9,900 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)

0 0
Add a comment Improve this question Transcribed image text
✔ Recommended Answer
Answer #1

Total production engineering cost per machine hour = Fixed cost + Variable cost / Machine hours

Variable cost per hour = $779,950 / 9,500 = $82.1 per machine hour

Total production engineering cost per machine hour = $200,970 + 812,790 (9,900*$82.1) / 9,900

Total production engineering cost per machine hour = $102.4 per machine hour

Add a comment
Know the answer?
Add Answer to:
At an activity level of 9,500 machine-hours in a month, Falks Corporation’s total variable production engineering...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • At an activity level of 9,900 machine-hours in a month, Falks Corporation's total variable production engineering...

    At an activity level of 9,900 machine-hours in a month, Falks Corporation's total variable production engineering cost is $882,090 and its total fixed production engineering cost is $196,000. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 10,000 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.) Multiple Choice $107.81 $108.88 $108.70 $108.35

  • At an activity level of 9,200 machine-hours in a month, Falks Corporation's total variable production engineering...

    At an activity level of 9,200 machine-hours in a month, Falks Corporation's total variable production engineering cost is $825,240 and its total fixed production engineering cost is $249,100. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 9,400 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)

  • At an activity level of 8,500 machine-hours in a month, Falks Corporation's total variable production engineering...

    At an activity level of 8,500 machine-hours in a month, Falks Corporation's total variable production engineering cost is $708,900 and its total fixed production engineering cost is $168,210. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 8,900 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)

  • At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production engineering...

    At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production engineering cost is $803,530 and its total fixed production engineering cost is $161,280. What would be the total production engineering cost per unit, both fixed and variable, at an activity level of 9,600 machine-hours in a month? Assume that this level of activity is within the relevant range. (Do not round intermediate calculations.)

  • 5. At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production...

    5. At an activity level of 9,100 machine-hours in a month, Nooner Corporation's total variable production engineering cost is $803,530 and its total fixed production engineering cost is $161,280. What would be the total production engineering cost per unit, both fixed and variable, at an activity level of 9,600 machine-hours in a month? Assume that this level of activity is within the relevant range. (Do not round intermediate calculations.)

  • TB MC Qu. 1-133 At an activity level of.. A n activity level of 9.00 machine...

    TB MC Qu. 1-133 At an activity level of.. A n activity level of 9.00 machine hours in a month, Fakes Corporation's total variable production engineering cost is $765,310 and is totalfied production engineering costs 5224070 What would be the total production engineering Couper machine hour, both fixed and variablet an activity level of 9700 machine hours in a month Assume that this level of activity within the relevant range. Round Intermediate calculations to 2 decimal places.) Maple Choice O...

  • A manufacturing company prepays its insurance coverage for a three-year period. The premium for the three years...

    A manufacturing company prepays its insurance coverage for a three-year period. The premium for the three years is $3,330 and is paid at the beginning of the first year. Ninety percent of the premium applies to manufacturing operations and ten percent applies to selling and administrative activities. What amounts should be considered product and period costs respectively for the first year of coverage? 2:25 TTT Product Period A) $3,330 $2,997 $1,998 B) c) D) $333 $222 $999 $111 Multiple Choice...

  • Crosshill Company’s total overhead costs at various levels of activity are presented below: Month Machine-Hours Total...

    Crosshill Company’s total overhead costs at various levels of activity are presented below: Month Machine-Hours Total Overhead Cost      April 54,000    $188,180        May 44,000    $163,980        June 64,000    $212,380        July 74,000    $236,580   Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 44,000-machine-hour level of activity in May is as follows:   Utilities (variable) $ 52,800     Supervisory salaries (fixed) 44,000   Maintenance (mixed) 67,180   Total overhead cost $ 163,980 The...

  • Crosshill Company’s total overhead costs at various levels of activity are presented below: Month Machine-Hours Total...

    Crosshill Company’s total overhead costs at various levels of activity are presented below: Month Machine-Hours Total Overhead Cost      April 54,000    $188,180        May 44,000    $163,980        June 64,000    $212,380        July 74,000    $236,580   Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 44,000-machine-hour level of activity in May is as follows:   Utilities (variable) $ 52,800     Supervisory salaries (fixed) 44,000   Maintenance (mixed) 67,180   Total overhead cost $ 163,980 The...

  • Nova Company’s total overhead cost at various levels of activity are presented below: Month Machine-Hours Total...

    Nova Company’s total overhead cost at various levels of activity are presented below: Month Machine-Hours Total Overhead Cost      April 52,000           $192,320              May 42,000           $166,720              June 62,000           $217,920              July 72,000           $243,520         Assume that the total overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 42,000 machine-hour level of activity is:   Utilities (variable) $ 58,800     Supervisory salaries (fixed) 43,000   Maintenance (mixed) 64,920   Total overhead cost $...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT