Answer:-
Project A
Rate of interest = discount rate = 12%
Initial investment at year 0 = X = 1250
Operating cash outflow from year 5 till 100th year = Y = 80
Salvage value at the end of 100th year = Z = 1000000
PW A = -1250 - 80 / ( 1+0.12)5 - 80 /
(1+0.12)6 --------- - 80 / (1 +0.12)100 +
1000000 / (1+0.12)100
PW A = -1662.98
Project B
Initial investment at year 0= 250
Operating cash outflow from end of year 1 to end of year 5 =
120
Salvage value at end of year 5 = 50
PW B = -250 - 120 / (1+0.12) - 120 / (1+0.12)2 - 120 /
(1+0.12)3 - 120 / (1+0.12)4 - 120 /
(1+0.12)5 + 50 / (1+0.12)5
PW B = -250 - 107.14 - 95.66 - 85.41 - 76.26 - 68.09 + 28.38
PW B = - 682.56 + 28.38
PW B = -654.18
1. Project A costs X amount of money to begin and Y amount of money to...
Name: 1. Project A costs X amount of money to begin and Y amount of money to operate every year starting from end of Year 5 and will last forever; also Z of salvage value at Year 100. Project B cost P amont of money to begin and Q amount of money to operate every year starting from end of Year is to end of Year 5 and Sof salvage value at end of Year 5. Use an annual rate...
PWA = PWB = 1 2. Project C costs X to begin and costs Y every year to operate with a salvage value of Z at the end of Year 5. Project D costs P to begin and costs Q every year to operate with a salvage value of S at the end. D will last forever. Use an annual rate of R to conduct an Annual Worth Analysis to determine the AW of both Cand. D. X = -400...
2. Project C costs X to begin and costs Y every year to operate with a salvage value of Z at the end of Year 5. Project D costs P to begin and costs Qevery year to operate with a salvage value of S at the end. D will last forever. Use an annual rate of R to conduct an Annual Worth Analysis to determine the AW of both C and D. X -500 Y = -50 Z = 120...
X= -500 Y=-50 Q=-60 S=600 Z=120 R=6.00% P=-1200 2. Project C costs x to begin and costs Y every year to operate with a salvage value of Z at the end of Year 5. Project D costs P to begin and costs a every year to oper of S at the end. D will last forever. Use an annual rate of R to conduct an Annual Worth Analysis to determine the AW of both C and D. ate with a...
Show your procedure and provide a cash flow diagram along with standard factor notation for your end result. Project A costs -$1,500 to begin and -$95 to operate every year starting from the end of Year 5 and will last forever; also $1,000,000 of salvage value at year 100. Project B cost -$ 186 to begin and - $130 to operate every year starting from the end of Year 1 to end of Year 5 and $70 of salvage value...
Show your procedure and provide a cash flow diagram along with standard factor notation for your end result. Project C costs -$500 to begin and costs -$50 every year to operate with a salvage value of $120 at the end of Year 5. Project D costs -$1200 to begin and costs -$60 every year to operate with a salvage value of $600 at the end. D will last forever. Use an annual rate of R to conduct an Annual Worth...
You are faced with a decision on an investment proposal. Specially, the estimated additional income from the investment is $180,000 per year; the initial investment costs are $640,000; and the estimated annual costs are $44,000, which begin decreasing by $4,000 per year starting at the end of third year. Assume an 8-year analysis period, no salvage value, and MARR = 15% (4.3, 4.6)a. What is PW of this proposal?b. What is IRR of this proposal?
1. A printing machine costs P400,000 to purchase with a life of 10 years with no salvage value .If the rate of interest is 10% per annum. compounded annually ,compute the equivalent uniform annual cost of the machine if it will cost P100,000 per year to operate ? 2. The first cost of an electric rebar bender is P324,000 and a salvage value of P50,000 at the end of its life for 4 years .Money is worth 6% annually .If...
4. Project 1 costs A initially, costs B every year, generates C benefits every year and D disbenefits every year with a life of 5 years. Project 2 costs e initially, cost F every year, generates G benefits every year and H disbenefits every year with a life of 6 years. Project 3 costs I initially, costs J every year, generates K benefits every year and L disbenefits every year with a life of 10 years. Use an annual rate...
4. Project 1 costs A initially, costs B every year, generates C benefits every year and D disbenefits every year with a life of 5 years. Project 2 costs E initially, cost Fevery year, generates G benefits every year and H disbenefits every year with a life of 6 years. Project 3 costs I initially, costs) every year, generates K benefits every year and L disbenefits every year with a life of 10 years. Use an annual rate of R...