Please show all work
2. Julia, a private tutor, is considering buying a new power lawn mower. It would save her 30 minutes of work a week, which she would use to see another client. Her fee is $16 per hour and she works 50 weeks a year. The lawnmower would cost $1,400. What would her IRR be if the mower was expected to last 8 years? Express your figures on an annual basis and assume that her required rate of return is 9 percent.
3. Stan's washing machine broke down. He has a choice of two washing machines of equal performance. The first choice, the GE turbo model, cost $400 and had a PV of $230 in savings over having clothes done through an outside service. The second one, a GE supra, cost $600 and had a PV of $450. Which one should he select?
Please show all work 2. Julia, a private tutor, is considering buying a new power lawn...
Please solve the following three problems 1) Sarah was presented with capital expenditure for a new air conditioning unit which costs $12,000 today and would generate the following savings. Year 1 = 2,000 Year 2 = 3,000 Year 3 = 2,000 Year 4 = 4,000 Year 5 = 5,000 Year 6 = 7,500 Year 7 = 5,000 Year 8 = 2,500 If the appropriate discount rate is 8 percent, what are the NPV and the IRR for this outlay? 2....
Jo, a private tutor, is considering buying a new power lawn mower. It would save her 30 minutes of work a week, which she would use to see another client. Her fee is $16 per hour and she works 50 weeks a year. The lawn mower would cost $1,400. What would her IRR be if the mower was expected to last 8 years? Express your figures on an annual basis and assume that her required rate of return is 9...
Please show all work
PROBLEMS: 1. V Boutique is a fashion house that designs, manufactures, and sells evening gowns. Their lowest-selling design is a vibrant green strapless gown in Dupioni silk. V Boutique is considering lowering the selling price of the gown to stimulate demand. However, before lowering the price, they must evaluate the total costs associated with the gown. • Fabric and materials - $62/gown • Labor to construct the gown - $40/gown • Equipment cost for these gowns...