Question

Problem 7-60 (Static) Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway...

Problem 7-60 (Static) Show Flow of Costs to Jobs (LO 7-2, 3)

Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $36,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on May 1 with the following costs.

Job 27
Highlands Mall
Job 33
Pine Ridge Estates
Materials and equipment $ 15,375 $ 52,500
Direct labor 13,500 26,250
Overhead (applied) 4,050 7,875

Overhead has been applied at 30 percent of the costs of direct labor.

During May, Kim's Asphalt started two new jobs. Additional work was carried out on Jobs 27 and 33, with the latter completed and billed to Pine Ridge Estates. Details on the costs incurred on jobs during May follow.

Job 27 33 34 35
Materials and equipment $ 3,000 $ 4,800 $ 4,600 $ 2,900
Direct labor (wages payable) 4,500 6,750 5,900 1,600

Other May Events

  1. Received $12,500 payment on Job 24 delivered to customer in April.
  2. Purchased materials and equipment for $9,400 on account.
  3. Billed Pine Ridge Estates $130,000 and received payment for $75,000 of that amount.
  4. Determined that payroll for indirect labor personnel totaled $650.
  5. Issued supplies and incidental materials for current jobs costing $155.
  6. Recorded overhead and advertising costs for the operation as follows (all cash except equipment depreciation).
Property taxes $ 550
Storage area rental 675
Truck and delivery cost 320
Advertising and promotion campaign 600
Inspections 200
Telephone and other miscellaneous 325
Equipment depreciation 450

Required:

a. Prepare journal entries to record the flow of costs for operations during May.

b. Calculate the amount of over- or underapplied overhead for the month.

c. Determine inventory balances for Materials and Equipment Inventory and Work-in-Process Inventory.

0 0
Add a comment Improve this question Transcribed image text
✔ Recommended Answer
Answer #1

Answer :

(a)

General Journal Debit Credit
1 Cash $12,500
Accounts receivable $12,500
2 Material and equipment inventory $9,400
Accounts payable $9,400
3 Accounts receivable $130,000
Sales revenue $130,000
Cash $75,000
Accounts receivable $75,000
4 Manufacturing overhead $650
Wages payable $650
5 Manufacturing overhead $155
Material and equipment inventory $155
6 Manufacturing overhead ($550+675+320+200+325+450) $2,520
Selling and administrative cost-(Advertising) 600
Cash ($2,520+600-450) $2,670
Accumulated depreciation 450

(b).

Actual overhead = $650 (indirect labor)+155(indirect material)+2,520(other manufacturing overhead) = $3,325

Applied overhead = $18,750 (Total direct labor cost for May)*30% = $5,625

Over applied overhead = $2,300

(c).

Material and equipment inventory = $36,000 (Beginning balance)+9,400 (Purchases)-15,300 (Direct material issued)-155 (Indirect material)

Material and equipment inventory = $29,945

Work in process inventory = $119,550 (Job 27+Job 33)+15,300 (Direct material issued)+18,750 (Direct labor cost)+5,625 (Applied overhead)-100,200 (Cost of Job 33 completed ) = $59,025

Working Note:

Cost of Job 33 completed = $86,625 ( Beginning balance)+13,575 (4,800+6,750+6,750*30%) = $100,200

Please Upvote Thank You !!!

Add a comment
Know the answer?
Add Answer to:
Problem 7-60 (Static) Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

    Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $47,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...

  • Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

    Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $40,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...

  • Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

     Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $38,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...

  • Problem 7-53 Show Flow of Costs to Jobs I am having a hard time figuring out...

    Problem 7-53 Show Flow of Costs to Jobs I am having a hard time figuring out the 8th and 9th journal entry. Please show work :) Problem 7-53 Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is...

  • Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

    Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $45,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...

  • Kim’s Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

    Kim’s Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of raw materials is on hand at all times so that work can start as quickly as possible. On May 1, the Raw Materials inventory account had a balance of $24,000. As of May 1, the Work In Process (WIP) inventory account had two jobs not yet complete with the following costs: Job 27 Highlands Mall Job 33 Pine...

  • Exercise 7-22 (Static) Assigning Costs to Jobs (LO 7-1, 2) The following transactions occurred in April...

    Exercise 7-22 (Static) Assigning Costs to Jobs (LO 7-1, 2) The following transactions occurred in April at Steve’s Cabinets, a custom cabinet firm. Purchased $80,000 of materials on account. Issued $4,000 of supplies from the materials inventory. Purchased $56,000 of materials on account. Paid for the materials purchased in transaction (1) using cash. Issued $68,000 in direct materials to the production department. Incurred direct labor costs of $100,000, which were credited to Wages Payable. Paid $106,000 cash for utilities, power,...

  • chap 16 - Entries and Schedules for Unfinished Jobs and Completed Jobs Hildreth Company uses a...

    chap 16 - Entries and Schedules for Unfinished Jobs and Completed Jobs Hildreth Company uses a job order cost system. The following data summarize the operations related to production for April, the first month of operations: Materials purchased on account, $3,190. Materials requisitioned and factory labor used: Job No. Materials Factory Labor 101 $3,150 $3,050 102 3,840 4,120 103 2,550 2,010 104 8,630 7,560 105 5,480 5,760 106 4,000 3,660 For general factory use 1,070 4,510 Factory overhead costs incurred...

  • Entries and Schedules for Unfinished Jobs and Completed Jobs Hildreth Company uses a job order cost...

    Entries and Schedules for Unfinished Jobs and Completed Jobs Hildreth Company uses a job order cost system. The following data summarize the operations related to production for April, the first month of operations: a. Materials purchased on account, $3,320. b. Materials requisitioned and factory labor used: Job No. Materials Factory Labor 101 $2,960 $1,950 102 3,610 2,630 103 2,400 1,290 104 8,110 4,840 105 5,150 3,690 106 2,340 For general factory use 3,760 1,010 2,890 c. Factory overhead costs incurred...

  • Exercise 7-22 (Algo) Assigning Costs to Jobs (LO 7-1, 2) The following transactions occurred in April...

    Exercise 7-22 (Algo) Assigning Costs to Jobs (LO 7-1, 2) The following transactions occurred in April at Steve's Cabinets, a custom cabinet firm. 1. Purchased $22.500 of materials on account. 2. Issued $1,450 of supplies from the materials inventory. 3. Purchased $12,500 of materials on account. 4. Paid for the materials purchased in transaction (1) using cash. 5. Issued $14,900 in direct materials to the production department. 6. Incurred direct labor costs of $26,500, which were credited to Wages Payable....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework