Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $38,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on May 1 with the following costs.
Overhead has been applied at 30 percent of the costs of direct labor.
During May. Kim's Asphalt started two new jobs. Additional work was carried out on Jobs 27 and 33, with the latter completed and billed to Pine Ridge Estates. Details on the costs incurred on jobs during May follow.
Other Mey Events
1. Received $12.700 payment on Job 24 delivered to customer in April.
2. Purchased materials and equipment for $9,600 on account.
3. Billed Pine Ridge Estates $132.000 and received payment for $85,000 of that amount.
4. Determined that payroll for Indirect labor personnel totaled $670.
5. Issued supplies and incidental materials for current jobs costing $175.
6. Recorded overhead and advertising costs for the operation as follows (all cash except equipment depreciation).
Required:
a. Prepare journal entries to record the flow of costs for operations during May.
b. Calculate the amount of over- or underapplied overhead for the month.
c. Determine inventory balances for Materials and Equipment Inventory and Work-in-process inventory.
(a)
General Journal |
Debit |
Credit |
|
1 |
Cash |
$12,700 |
|
Accounts receivable |
$12,700 |
||
2 |
Material and equipment inventory |
$9,600 |
|
Accounts payable |
$9,600 |
||
3 |
Accounts receivable |
$132,000 |
|
Sales revenue |
$132,000 |
||
Cash |
$85,000 |
||
Accounts receivable |
$85,000 |
||
4 |
Manufacturing overhead |
$670 |
|
Wages payable |
$670 |
||
5 |
Manufacturing overhead |
$175 |
|
Material and equipment inventory |
$175 |
||
6 |
Manufacturing overhead ($570+695+340+220+345+470) |
$2,640 |
|
Selling and administrative cost-(Advertising) |
620 |
||
Cash ($2,640+620-470) |
$2,790 |
||
Accumulated depreciation |
470 |
(b).
Actual overhead = $670 (indirect labor)+175(indirect material)+2,640(other manufacturing overhead) = $3,485
Applied overhead = $19,550 (Total direct labor cost for May)*30% = $5,865
Over applied overhead = $2,380
(c).
Material and equipment inventory = $38,000 (Beginning balance)+9,600 (Purchases)-16,100 (Direct material issued)-175 (Indirect material)
Material and equipment inventory = $31,325
Work in process inventory = $120,440 (Job 27+Job 33)+16,100 (Direct material issued)+19,550 (Direct labor cost)+5,865 (Applied overhead)-100,990 (Cost of Job 33 completed ) = $60,965
Working Note:
Cost of Job 33 completed = $86,955 ( Beginning balance)+14,035 (5,000+6,950+6,950*30%) = $100,990
I HOPE IT USEFUL TO YOU IF YOU HAVE ANY DOUBT PLZ COMMENT GIVE ME UP-THUMB. THANKS....
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $47,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $40,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $45,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim’s Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of raw materials is on hand at all times so that work can start as quickly as possible. On May 1, the Raw Materials inventory account had a balance of $24,000. As of May 1, the Work In Process (WIP) inventory account had two jobs not yet complete with the following costs: Job 27 Highlands Mall Job 33 Pine...
Problem 7-60 (Static) Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $36,000. The Work-in-Process Inventory account is maintained to record...
Problem 7-53 Show Flow of Costs to Jobs
I am having a hard time figuring out the 8th and 9th journal
entry. Please show work :)
Problem 7-53 Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is...
Post the entries to Work in Process Inventory, and prove the
agreement of the control account with the job cost sheets.
Exercise 15-02 a-b (Video) (Part Level Submission) Bonita Company uses a job order cost system. On May 1, the company has a balance in Work in Process Inventory of $3,890 and two jobs in process: Job No. 429 $2,540, and Job No. 430 $1,350. During May, a summary of source documents reveals the following. Materials Labor Time Job Number...
Widmer Watercraft's predetermined overhead rate for the year 2017 is 200% of direct labor. Information on the company's production activities during May 2017 follows. a. Purchased raw materials on credit, $200,000. b. Materials requisitions record use of the following materials for the month $ 48,000 32.000 19,209 22.400 Job 136 Job 137 Job 138 Job 139 Job 140 Total direct materials Indirect materials Total materials used 128,000 19.500 $147.500 nces c. Paid $15,000 cash to a computer consultant to reprogram...
Need some help with part 2 preparing the journal entry.
a. Record raw material purchases on credit.
b. Record the requisition of direct and indirect materials.
c. Record payment to computer consultant to reprogram factory
equipment.
d. Record the entry for direct and indirect labor, paid in
cash.
e. Record the entry to apply overhead to jobs 136, 138 and
139.
f. Record the transfer of completed jobs 136,138 and 139 to
finished goods.
g(1). Record the entry for sales...
Required information Problem 15-3A Source documents, journal entries, and accounts in job order costing LO P1, P2, P3 [The following information applies to the questions displayed below.] Widmer Watercraft's predetermined overhead rate is 200% of direct labor Information on the company's production activities during May follows. a. Purchased raw materials on credit. $220,000. b. Materials requisitions record use of the following materials for the month Job 136 Job 137 Job 138 Job 139 Job 140 Total direct materials Indirect materials...
> Truck delivery, telephone expense will also be part of administrative cost
HSharma007 Sun, Mar 6, 2022 8:16 PM