Kim’s Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of raw materials is on hand at all times so that work can start as quickly as possible. On May 1, the Raw Materials inventory account had a balance of $24,000. As of May 1, the Work In Process (WIP) inventory account had two jobs not yet complete with the following costs:
Job 27 Highlands Mall |
Job 33 Pine Ridge Estates |
|
Direct Materials |
$10,250 |
$35,000 |
Direct Labor |
9,000 |
17,500 |
MOH (allocated) |
2,700 |
5,250 |
Overhead is allocated at the rate of 30% of direct labor costs. MOH is allocated at the end of the month for incomplete jobs, and again when a job is completed.
May Events:
Job 27 Highlands Mall |
Job 33 Pine Ridge Estates |
Job 34 Studio C Cinema |
Job 35 Jones Residence |
|
Direct Materials |
$2,000 |
$3,200 |
$4,600 |
$2,000 |
Direct Labor (paid in cash) |
3,000 |
4,500 |
5,900 |
1,600 |
Property taxes |
$550 |
Storage area rental |
675 |
Truck and supplies delivery cost |
320 |
Inspections |
200 |
Utilities |
325 |
Equipment depreciation (repair equipment) |
450 |
Required:
kim’s asphalt does driveway and parking lot resurfacing... | ||||||
Job 27$ | Job 33$ | Total | ||||
Direct Material$ | 10,250 | 35,000 | 45,250 | |||
Direct Labour | 9,000 | 17,500 | 26,500 | |||
MOH ( allocated) | 2,700 | 5,250 | 7,950 | |||
As per question - OH calculated on 30% * Direct Labour cost | ||||||
May Events | ||||||
Job 27$ | Job 33$ | Job 34$ | Job 35$ | |||
Direct Material$ | 2,000 | 3,200 | 4,600 | 2,000 | ||
Direct Labourpaid in Cash) | 3,000 | 4,500 | 5,900 | 1,600 | ||
Details | Debit($) | credit($) | ||||
cash | 12,500 | |||||
Account Receivable | 12,500 | |||||
Material ( Inventory) | 9,400 | |||||
Account Payable | 9,400 | |||||
Account Receivable | 87,500 | |||||
Sales | 87,500 | |||||
Cash | 50,000 | |||||
Account Receivable | 50,000 | |||||
Manufature OH ( Labour) | 650 | |||||
Wages payable | 650 | |||||
Manufature OH | 155 | |||||
Material ( Inventory) | 155 | |||||
Manufature OH | 3,120 | |||||
Property Tax | 550 | |||||
Storage Rental Area | 675 | |||||
Truck and Supplies delivery cost | 320 | |||||
Equiment Depreciation | 450 | |||||
Advertising & promotion | 600 | |||||
Inspection | 200 | |||||
Utilities | 325 | |||||
Cash | 2,670 | |||||
Accumulated depreciation | 450 | |||||
Overhead - Under / Over | Job 27$ | Job 33$ | Job 34$ | Job 35$ | Total$ | |
Direct labour | 3,000 | 4,500 | 5,900 | 1,600 | 15,000 | |
MOH @ 30% on DLH | 4,500 | A | ||||
Actual Manufacture OH | Amnt$ | |||||
Manufature OH | 3,120 | |||||
Wages payable | 650 | |||||
Material ( Inventory) | 155 | |||||
Actual Manufacture OH | 3,925 | B | ||||
Over applied(A-B) $ | 575 | |||||
Job 33 Cost of goods sold | ||||||
Direct Material$ | 35,000 | |||||
Direct Labour | 17,500 | |||||
MOH ( allocated) | 5,250 | |||||
Total | 57,750 | |||||
Direct Material$- may Event | 3,200 | |||||
Direct Labour | 4,500 | |||||
MOH ( allocated)-30% of DL | 1,350 | |||||
Total cost of goods sold | 66,800 | |||||
Details | Debit($) | credit($) | ||||
Cost of goods Sold | 66,800 | |||||
Work in process - Job 33 | 66,800 | |||||
Work in process - Job 27 | 2,000 | |||||
Work in process - Job 33 | 3,200 | |||||
Work in process - Job 34 | 4,600 | |||||
Work in process - Job 35 | 2,000 | |||||
Material ( Inventory) | 11,800 |
Material Inventory | |||
Details | Debit($) | Details | Credit($) |
Opening bal | 24,000 | Manufature OH | 155 |
Account Payable | 9,400 | Direct Material Issue | 11,800 |
Closing bal | 21,445 | ||
Total | 33,400 | Total | 33,400 |
Work In process | |||
Details | Debit($) | Details | Credit($) |
Direct Material$ | 45,250 | Cost of goods Sold | 66,800 |
Direct Labour | 26,500 | Closing bal | 44,200 |
MOH ( allocated) | 7,950 | ||
( J0b 27 &33) | |||
Material Inventory | 11,800 | ||
Direct Labour cost | 15,000 | ||
MOH ( allocated) | 4,500 | ||
Total | 1,11,000 | Total | 1,11,000 |
Kim’s Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $47,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $40,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $45,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $38,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Problem 7-60 (Static) Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $36,000. The Work-in-Process Inventory account is maintained to record...
Problem 7-53 Show Flow of Costs to Jobs I am having a hard time figuring out the 8th and 9th journal entry. Please show work :) Problem 7-53 Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is...
Farm Equipment, Inc., produces tractors and other farm machinery. Each piece of equipment is built to customer specifications. During May, its first month of operations, Farm Equipment, Inc., began working on three customer orders: jobs 1, 2, and 3. The following transactions occurred during May: Purchased production materials on account totaling $450,000 Processed material requisitions for the following items: Job 1 direct materials $77,600 Job 2 direct materials $38,600 Job 3 direct materials $45,000 Indirect materials $87,000 Processed timesheets showing...
19. Maxon Manufacturing Co. uses a job cost accounting system. On May 1, the company has $0 in its Work in Process (WIP) Inventory account. Maxon starts work on four Jobs in May (221-224). Jobs 221 and 222 completed on May 30. During May, a summary of production data shows the following: For Direct Materials Cost Direct Labor Cost Factory Overhead Cost Job 221 $4,800 $3,200 $1,536 Job 222 4,400 2,000 960 Job 223 3,900 2.000 $??? Job 224 2,500...
Pedriani Company uses a job order cost system and applies overhead on the basis of direct labor hours. On Jan01, 2017, Job No. 25 was the only job in process. Costs incurred prior to Jan01 on this job were as follows: direct materials $10,000; direct labor $6,000; and manufacturing overhead $9,000. Job No. 23 had been completed at a cost of $42,000 and was part of finished goods inventory. There was a $5,000 balance in the Raw Materials Inventory account. During the...
Use below information for Questions 5 to 7: Company X uses a job cost system and applies overhead to production on the basis of direct labor cost. On January 1, 2018, Job 50 was the only job in process. The costs incurred prior to January 1 on this job were as follows: DM of TL27,000, DL of TL11,600, and MOH of TL15,003. As of January 1, Job 49 had been completed at a cost of TL85,007 and was part of...