Question
Please answer all parts and show work.
Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three
0 0
Add a comment Improve this question Transcribed image text
Answer #1

a. Traditional costing:

Direct labor hours per unit of A : $ 84 / $ 28 = 3 hours

Direct labor hours per unit of B : $ 98 / $ 28 = 3.5 hours

Direct labor hours per unit of C = $ 70 / $ 28 = 2.5 hours.

Therefore budgeted number of direct labor hours = 3 dlh x 25,000 units + 3.5 dlh x 18,000 unirs + 2.5 dlh x 22,000 = 193,000 direct labor hours.

Predetermined overhead rate = $ 13,896,000 / 193,000 DLH = $ 72 per DLH.

A B C
Direct Materials $ 156 $ 179 $ 185
Direct Labor 84 98 70
Manufacturing Overhead 216 252 180
Total Cost per Unit $ 456 $ 529 $ 435
Add a comment
Know the answer?
Add Answer to:
Please answer all parts and show work. Peabody Company has a single plant, and manufactures three...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Show work and answer all parts. Peabody Company has a single plant, and manufactures three products....

    Show work and answer all parts. Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three products. A B 156 179 185 Raw materials ($) Direct labor ($) Machine hours 98 84 2.5 70 2.1 2.6 The following table contains aggregate data for the year for the three products. Budgeted production (units) Number of inspections Number of setups 25,000 250 8,000 180 60 22,000 220 90 100 Other information: Wage...

  • Please show work, do all parts. Thank you! Peabody Company has a single plant, and manufactures...

    Please show work, do all parts. Thank you! Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three products. A B 156 179 185 Raw materials ($) Direct labor ($) Machine hours 98 84 2.5 70 2.1 2.6 The following table contains aggregate data for the year for the three products. Budgeted production (units) Number of inspections Number of setups 25,000 250 8,000 180 60 22,000 220 90 100 Other...

  • Show work/formulas Peabody Company has a single plant, and manufactures three products. The following table contains...

    Show work/formulas Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three products. A B 156 179 185 Raw materials ($) Direct labor ($) Machine hours 98 84 2.5 70 2.1 2.6 The following table contains aggregate data for the year for the three products. Budgeted production (units) Number of inspections Number of setups 25,000 250 8,000 180 60 22,000 220 90 100 Other information: Wage rate is $28/hour Budgeted...

  • Peabody Company has a single plant, and manufactures three products. The following table contains per unit...

    Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three products. A B C Raw materials ($) 156 179 185 Direct labor ($) 84 98 70 Machine hours 2.5 2.6 2.1 The following table contains aggregate data for the year for the three products. A B C Budgeted production (units) 25,000 18,000 22,000 Number of inspections 250 180 220 Number of setups 100 60 90 Other information: Wage rate is...

  • a) Assume that Peabody uses a traditional costing system, with overhead allocated based on direct labor...

    a) Assume that Peabody uses a traditional costing system, with overhead allocated based on direct labor hours.   Compute the total cost per unit of each of the three products. b) Instead assume that Peabody uses an ABC system with three cost drivers: machine hours, inspections, and setups. Manufacturing overhead cost of $1,300,000 is due to setups, and $130,000 to inspections, with the rest allocated to machine hours. Compute the total cost per unit of the three products. The following table...

  • Please show work. Thanks Group Problem 2 SU Company makes two products: Standard and Unique. The...

    Please show work. Thanks Group Problem 2 SU Company makes two products: Standard and Unique. The Standard product line is a high volume line and the Unique line is a low volume, specialized product. Assume the overhead costs from service departments have gone through a stage 1 allocation. SU currently uses a machine hour basis to allocate indirect manufacturing costs to its product line, but is curious about Activity Based Costing. There current cost management system already provides the following...

  • Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget...

    Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget for the year includes $432,000 payroll for 4,800 direct labor-hours. Listed below is cost driver information used in the product-costing system: Overhead Cost Pool Budgeted Overhead Cost Driver Estimated Cost Driver Level Machine setups $ 120,000 # of setups 120 setups Materials handling 104,400 # of barrels 8,700 barrels Quality control 264,000 # of inspections 1,100 inspections Other overhead cost 144,000 # of machine...

  • Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget...

    Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget for the year includes $576,000 payroll for 7,200 direct labor-hours. Listed below is cost driver information used in the product-costing system: Overhead Cost Pool Budgeted Overhead Cost Driver Estimated Cost Driver Level Machine setups $ 240,000 # of setups 240 setups Materials handling 111,600 # of barrels 9,300 barrels Quality control 828,000 # of inspections 2,300 inspections Other overhead cost 648,000 # of machine...

  • Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget...

    Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget for the year includes $444,000 payroll for 5,000 direct labor-hours. Listed below is cost driver information used in the product-costing system: Overhead Cost Pool Machine setups Materials handling Quality control Other overhead cost Total overhead Budgeted Overhead $ 171,250 105,000 300,000 175,000 $ 751, 250 Cost Driver # of setups # of barrels # of inspections # of machine hours Estimated Cost Driver Level...

  • Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget...

    Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget for the year includes $648,000 payroll for 8,400 direct labor-hours. Listed below is cost driver information used in the product-costing system: Overhead Cost Pool Budgeted Overhead Cost Driver Estimated Cost Driver Level Machine setups $ 1,599,200 # of setups 300 setups Materials handling 115,200 # of barrels 9,600 barrels Quality control 1,218,000 # of inspections 2,900 inspections Other overhead cost 1,008,000 # of machine...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT