A B C
Direct Labor                     84.00                         98.00                  70.00
Wage Rate                     28.00                         28.00                  28.00
Direct Labor Hours-PU                       3.00                            3.50                     2.50
Budgeted Production                  25,000                       18,000                22,000 Total
Direct Labor Hours-Total                  75,000                       63,000                55,000     193,000
Budgeted Overhead          13,896,000
Direct Labor Hours-Total                193,000
Overhead Allocation Rate                     72.00
A B C
Raw Material                  156.00                       179.00                185.00
Direct Labor                     84.00                         98.00                  70.00
Overhead Allocation                  216.00                       252.00                180.00
Total Cost Per Unit                  456.00                       529.00                435.00
Allocation base
Cost A B C Total Allocation Rate
B Manufacturing OH Cost            1,300,000                       100.00                  60.00 90.00 250 5,200.00
Inspection Cost                130,000                       250.00                180.00 220.00 650 200.00
Machining Cost          12,466,000                       62,500                46,800       46,200 155,500 80.17
         13,896,000
Allocation to Product: A B C
Manufacturing OH Cost                520,000                     312,000              468,000
Inspection Cost                  50,000                       36,000                44,000
Machining Cost            5,010,450                 3,751,825          3,703,725
           5,580,450                 4,099,825          4,215,725
Units            25,000.00                 18,000.00          22,000.00
OH cost per Unit                  223.22                       227.77                191.62
A B C
Raw Material                  156.00                       179.00                185.00
Direct Labor                     84.00                         98.00                  70.00
Overhead Allocation                  223.22                       227.77                191.62
Total Cost Per Unit                  463.22                       504.77                446.62
C ABC allocates cost more precisely and accurately. It uses allocation of cost by way of usage
Add a comment
Know the answer?
Add Answer to:
Show work and answer all parts. Peabody Company has a single plant, and manufactures three products....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Please answer all parts and show work. Peabody Company has a single plant, and manufactures three...

    Please answer all parts and show work. Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three products. A B 156 179 185 Raw materials ($) Direct labor ($) Machine hours 98 84 2.5 70 2.1 2.6 The following table contains aggregate data for the year for the three products. Budgeted production (units) Number of inspections Number of setups 25,000 250 8,000 180 60 22,000 220 90 100 Other information:...

  • Show work/formulas Peabody Company has a single plant, and manufactures three products. The following table contains...

    Show work/formulas Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three products. A B 156 179 185 Raw materials ($) Direct labor ($) Machine hours 98 84 2.5 70 2.1 2.6 The following table contains aggregate data for the year for the three products. Budgeted production (units) Number of inspections Number of setups 25,000 250 8,000 180 60 22,000 220 90 100 Other information: Wage rate is $28/hour Budgeted...

  • Please show work, do all parts. Thank you! Peabody Company has a single plant, and manufactures...

    Please show work, do all parts. Thank you! Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three products. A B 156 179 185 Raw materials ($) Direct labor ($) Machine hours 98 84 2.5 70 2.1 2.6 The following table contains aggregate data for the year for the three products. Budgeted production (units) Number of inspections Number of setups 25,000 250 8,000 180 60 22,000 220 90 100 Other...

  • Peabody Company has a single plant, and manufactures three products. The following table contains per unit...

    Peabody Company has a single plant, and manufactures three products. The following table contains per unit data for the three products. A B C Raw materials ($) 156 179 185 Direct labor ($) 84 98 70 Machine hours 2.5 2.6 2.1 The following table contains aggregate data for the year for the three products. A B C Budgeted production (units) 25,000 18,000 22,000 Number of inspections 250 180 220 Number of setups 100 60 90 Other information: Wage rate is...

  • a) Assume that Peabody uses a traditional costing system, with overhead allocated based on direct labor...

    a) Assume that Peabody uses a traditional costing system, with overhead allocated based on direct labor hours.   Compute the total cost per unit of each of the three products. b) Instead assume that Peabody uses an ABC system with three cost drivers: machine hours, inspections, and setups. Manufacturing overhead cost of $1,300,000 is due to setups, and $130,000 to inspections, with the rest allocated to machine hours. Compute the total cost per unit of the three products. The following table...

  • Please show work. Thanks Group Problem 2 SU Company makes two products: Standard and Unique. The...

    Please show work. Thanks Group Problem 2 SU Company makes two products: Standard and Unique. The Standard product line is a high volume line and the Unique line is a low volume, specialized product. Assume the overhead costs from service departments have gone through a stage 1 allocation. SU currently uses a machine hour basis to allocate indirect manufacturing costs to its product line, but is curious about Activity Based Costing. There current cost management system already provides the following...

  • Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget...

    Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget for the year includes $432,000 payroll for 4,800 direct labor-hours. Listed below is cost driver information used in the product-costing system: Overhead Cost Pool Budgeted Overhead Cost Driver Estimated Cost Driver Level Machine setups $ 120,000 # of setups 120 setups Materials handling 104,400 # of barrels 8,700 barrels Quality control 264,000 # of inspections 1,100 inspections Other overhead cost 144,000 # of machine...

  • Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget...

    Everlast Co. manufactures a variety of drill bits. The company's plant is partially automated. The budget for the year includes $576,000 payroll for 7,200 direct labor-hours. Listed below is cost driver information used in the product-costing system: Overhead Cost Pool Budgeted Overhead Cost Driver Estimated Cost Driver Level Machine setups $ 240,000 # of setups 240 setups Materials handling 111,600 # of barrels 9,300 barrels Quality control 828,000 # of inspections 2,300 inspections Other overhead cost 648,000 # of machine...

  • Njombe Corporation manufactures a variety of products. In the past, Njombe has been using a traditional...

    Njombe Corporation manufactures a variety of products. In the past, Njombe has been using a traditional costing system in which the predetermined overhead rate was 150% of direct labor cost. Selling prices had been set by multiplying total product cost by 200%. Sensing that this system was distorting costs and selling prices, Njombe has decided to switch to an activity-based costing system for manufacturing overhead costs that uses the three activity cost pools listed below. Selling prices are still to...

  • Assignment (2): CH 7: ABC Leader Corporation manufactures two products: Product 095C and Product M3IN. The...

    Assignment (2): CH 7: ABC Leader Corporation manufactures two products: Product 095C and Product M3IN. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products 095C and M31N. Activity Cost Pool Machining Machine setups Product design Order size Activity Measure Machine-hours Number of setups Number of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT