how do I do this on excel?? Thanks in advance
Steps to be followed to present this in excel:
Now, Calculation of labour amounts: (Steps)
Follow, this procedure, for all the labour amounts. This way, you will get all the amounts of labour for suppliers A, B & C.
Now, for LINKING the labour amounts to the PIECE PRICE TABLE,
At last, calculate the PIECE PRICE.
You must be knowing the formula of piece price.
This is all you need to do, for this assignment.
IF YOU HAVE ANY DOUBTS OR QUERIES, PLEASE MENTION IN THE COMMENTS SECTION.
I WILL SURELY ANSWER THEM.
how do I do this on excel?? Thanks in advance For this assignment, you are going...
PLEASE SHOW ALL EXCEL FORMULAS USED FOR EACH CALCULATIONS. A
STEP BY STEP WALKTHROUGH OF HOW TO DO THE PROBLEM. Thank you so
much for your help!
Hours Feet Elevator Elevator
code
24.00 545 Yes 1
13.50 400 Yes 1
26.25 562 No 0
25.00 540 No 0
9.00 220 Yes 1
20.00 344 Yes 1
22.00 569 Yes 1
11.25 340 Yes 1
50.00 900 Yes 1
12.00 285 Yes 1
38.75 865 Yes 1
40.00 831 Yes 1...
I need help to write a nice introduction for experiment 6
please ( no hands write ) typing
Thank you
HEAT TREATMENT OF STEELS EXPERIMENT 6 EXPERIMENT 6 HEAT TREATMENT OF STEELS THEORY The Effect of Cooling Rate One of the most convenient methods for controlling the properties of a given steel, i.e., a steel whose composition is already fixed, consists of austenizing the steel and ten cooling to room temperature at some predetermined rate. A variation of cooling rates...