Overhead Applied to Jobs, Departmental Overhead Rates Xania Inc, uses a normal job-order costing system. Currently, a plantwi
3. Conceptual Connection: Job 73 used 20 machine hours from Department A and 50 machine hours from Department B. Job 74 used
4. Conceptual Connection: Repeat Requirement, assuming the expected overhead cost for Department is $106,000 (no 581,000). Ro
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer) Particulars Overhead costs Normal actovity (machine hrs) Department A Department B total $ 75,000.00 $ 81,000.00 $1,5Req 3 Ans) Particulars job 73 machine hours Working job 74. machine hours Working Amount Amount Plant wide Dep -A Dep-B TotalReq 4 Ans) Particulars job 73 machine hours Working job 74. machine hours Working Amount Amount Plant wide Dep -A Dep-B TotalConclusion : Company better to opt for departmental rates these amount are more accurate than blanket rate.

the overall rate does not differentiate in req-3 both jobs having same cost where as in case departmental rate used we see the difference. thats why departmental rate method was more accurate.

Add a comment
Know the answer?
Add Answer to:
Overhead Applied to Jobs, Departmental Overhead Rates Xania Inc, uses a normal job-order costing system. Currently,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Overhead Applied to Jobs, Departmental Overhead Rates Xania Inc. uses a normal job-order costing system. Currently,...

    Overhead Applied to Jobs, Departmental Overhead Rates Xania Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine hours is used. Xania’s plant manager has heard that departmental overhead rates can offer significantly better cost assignments than a plantwide rate can offer. Xania has the following data for its two departments for the coming year: Department A Department B Overhead costs (expected) $100,000 $61,000 Normal activity (machine hours) 18,000 14,800 Required: 1. Compute a predetermined...

  • Overhead Applied to Jobs, Departmental Overhead Rates Xania Inc. uses a normal job-order costing system. Currently,...

    Overhead Applied to Jobs, Departmental Overhead Rates Xania Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine hours is used. Xania’s plant manager has heard that departmental overhead rates can offer significantly better cost assignments than a plantwide rate can offer. Xania has the following data for its two departments for the coming year: Department A Department B Overhead costs (expected) $95,000 $48,000 Normal activity (machine hours) 12,000 3,800 Required: 1. Compute a predetermined...

  • 8 Overhead Applied to Jobs, Departmental Overhead Rates Watson Products Inc. uses a normal job-order costing...

    8 Overhead Applied to Jobs, Departmental Overhead Rates Watson Products Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine hours is used. Marlon Burke, the plant manager, has heard that departmental overhead rates can offer significantly better cost assignments than a plantwide rate can offer. Watson has the following data for its two departments for the coming year: Department B Department A $2,660,000 140,000 Overhead costs (estimated) Normal activity (machine hours) $924,000 84,000 Required:...

  • Xania Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine...

    Xania Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine hours is used. Xania's plant manager has heard that departmental overhead rates can offer significantly better cost assignments than a plantwide rate can offer. Xania has the following data for its two departments for the coming year: Department A Department B Overhead costs (expected) $750,000   $330,000   Normal activity (machine hours)   6,000       10,000   Required: Compute a predetermined overhead rate for the plant as a whole...

  • Xania Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine...

    Xania Inc. uses a normal job-order costing system. Currently, a plantwide overhead rate based on machine hours is used. Xania's plant manager has heard that departmental overhead rates can offer significantly better cost assignments than a plantwide rate can offer. Xania has the following data for its two departments for the coming year: Department A Department B Overhead costs (expected) $750,000   $330,000   Normal activity (machine hours)   6,000       10,000   Required: Compute a predetermined overhead rate for the plant as a whole...

  • Mariposa, Inc., produces machine tools and currently uses a plantwide overhead rate, based on machine hours....

    Mariposa, Inc., produces machine tools and currently uses a plantwide overhead rate, based on machine hours. Harry Whipple, the plant manager, has heard that departmental overhead rates can offer significantly better cost assignments than can a plantwide rate. Mariposa has the following data for its two departments for the coming year: Compute a predetermined overhead rate for the plant as a whole based on machine hours. Compute predetermined overhead rates for each department using machine hours. Suppose that a machine...

  • White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and...

    White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and compresa predetermined overhead rate in each department. The Cutting Department bases its rate on machine hours, and the Finishing Department bases its rate on direct labor hours. At the beginning of the year, the company made the following estimates: Cutting in 55,800 3. Total Fin est rechead coat Variable tacturing overhead per machine Required: 1. Compute the predetermined overhand rate for each department 2....

  • White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and...

    White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and computes a predetermined overhead rate in each department. The Cutting Department bases its rate on machine-hours, and the Finishing Department bases its rate on direct labor-hours. At the beginning of the year, the company made the following estimates: Department Cutting Finishing Direct labor-hours 64,000 Machine-hours 65,000 1,300 Total fixed manufacturing overhead cost $360,000 $488,600 Variable manufacturing overhead per machine-hour 4.00 Variable manufacturing overhead per...

  • White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and...

    White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and computes a predetermined overhead rate in each department. The Cutting Department bases its rate on machine-hours, and the Finishing Department bases its rate on direct labor-hours. At the beginning of the year, the company made the following estimates: Direct labor-hours Machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine-hour Variable manufacturing overhead per direct labor-hour Department Cutting Finishing 8,500 90,000 60,700 1,100...

  • White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and...

    White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and computes a predetermined overhead rate in each department. The Cutting Department bases its rate on machine-hours, and the Finishing Department bases its rate on direct labor-hours. At the beginning of the year, the company made the following estimates: Department Cutting Finishing Direct labor-hours 8,100 81,000 Machine-hours 59,900 2,900 Total fixed manufacturing overhead cost $ 380,000 $ 583,000 Variable manufacturing overhead per machine-hour $ 4.00...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT