I have used Excel for finding the regression equation.
Enter Time , Length, Thickness, Number of parts in Columns A, B,C and D.
Select Data -> Data Analysis -> Regression ->Ok -> a dialogue box appears -> In 'Input Y Range' select the range containing the data of Time -> In 'Input X Range' select the range containing the data of the other 3 variables ->Enable 'output range' -> select any blank column in the sheet -> Ok -> The output will appear as follows:
SUMMARY OUTPUT | ||||||||
Regression Statistics | ||||||||
Multiple R | 0.997582 | |||||||
R Square | 0.995171 | |||||||
Adjusted R Square | 0.993854 | |||||||
Standard Error | 0.308441 | |||||||
Observations | 15 | |||||||
ANOVA | ||||||||
df | SS | MS | F | Significance F | ||||
Regression | 3 | 215.6464 | 71.88213 | 755.5757 | 5.14E-13 | |||
Residual | 11 | 1.046491 | 0.095136 | |||||
Total | 14 | 216.6929 | ||||||
Coefficients | Standard Error | t Stat | P-value | Lower 95% | Upper 95% | Lower 95.0% | Upper 95.0% | |
Intercept | -0.8193 | 0.421674 | -1.94298 | 0.078045 | -1.7474 | 0.108795 | -1.7474 | 0.108795 |
X Variable 1 | 2.777736 | 0.082069 | 33.8463 | 1.79E-12 | 2.597103 | 2.958369 | 2.597103 | 2.958369 |
X Variable 2 | 0.083002 | 0.054656 | 1.518623 | 0.157062 | -0.0373 | 0.203298 | -0.0373 | 0.203298 |
X Variable 3 | 0.420802 | 0.060562 | 6.948289 | 2.43E-05 | 0.287506 | 0.554098 | 0.287506 | 0.554098 |
From the above output, the regression line can be constructed as:
T=-0.8193+2.777736 L+0.83002 t+0.420802 np
The estimated time for L=5.0 m, t=8 mm, np= 6 parts is
T= -0.8193+2.777736*5+0.83002*8+0.420802*6 = 22.234 min
standard data system will be based on the use of a mathema Welding ume depends on...
Question 1 A turning operation is carried out on aluminum. Based on the specific energy values in Table 20.2, determine material removal rate and cutting power in the operation under the following sets of cutting conditions: (a) Cutting speed 5.6 m/s, feed 0.25 mm/rev, and depth of cut 2.0 mm; and (b) cutting speed- 1.3 m/s, feed 0.75 mm/rev, and depth 4.0 mm. Question 2 Consider a turning operation performed on steel whose hardness 225 HB at a cutting speed...
5. What was the ratio of actual processing time for the product to total lead time? 1075 International Journal of Prodiction Resecarch Project Management 90,60 30 days forecast End Customers Hyerson Steel Weekly Schedule Dally Shipping Schedule Welding Finishing Assembly Wiring Fabrication 23 days CIT-140.5mn PIT-250 min C/T 126min days CT-128min PIT-480 min CIT 120 Ave CIT 120 CIO 15 days 3 days 3 days 3 days 1 days L. T. 25 days 480 min 2400 min IP.T. 3158.5 min...
summatize the following info and break them into differeng key points. write them in yojr own words apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...
summarizr the followung info and write them in your own words and break them into different key points. 6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...