The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating...
The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 48,000 m2 and the installed liner cost was $8 per m2. In order to recover the investment, the owner charges to unload at the rates of $18 per pickup, $25 per dump truck, and $70 per compactor truck load. The fill area is adequate for 5 years. If the annual traffic is estimated to be 2500 pickup...
The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 48,000 m2 and the installed liner cost was $8 per m2. In order to recover the investment, the owner charges to unload at the rates of $18 per pickup. $25 per dump truck, and $70 per compactor truck load. The fill area is adequate for 5 years. If the annual traffic is estimated to be 2500 pickup...
I need help with question 7.12. I looked at the step-by-step solution for that one but someone posted a comment saying that the answer is wrong and no one has commented on what the correct answer should be 201 Problems Determination of ROR 7.7 If a manufacturer of slectronic devices invests S650,000 in equipment for making compact piezo electric accelerometers for general purpose vibra Lion measurement estimate the rate of return from revenue of $225.000 per year for 10 years...