Question

The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater...

The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 48,000 m2 and the installed liner cost was $8 per m2. In order to recover the investment, the owner charges to unload at the rates of $18 per pickup, $25 per dump truck, and $70 per compactor truck load. The fill area is adequate for 5 years. If the annual traffic is estimated to be 2500 pickup loads, 650 dump-truck loads, and 1200 compactor-truck loads, what rate of return will the landfill owner make on the investment?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

$ cost per m2 total fill area (m2) total cost 48,000 384,000 $ activity level of activity charge total revenue pickup 2,500 $

Add a comment
Know the answer?
Add Answer to:
The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating...

    The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 48,000 m2 and the installed liner cost was $8 per m2. In order to recover the investment, the owner charges to unload at the rates of $18 per pickup. $25 per dump truck, and $70 per compactor truck load. The fill area is adequate for 5 years. If the annual traffic is estimated to be 2500 pickup...

  • The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating...

    The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 48,000 m- and the installed liner cost was $8 per m. In order to recover the investment, the owner charges to unload at the rates of $18 per pickup. $25 per dump truck, and $70 per compactor truck load. The fill area is adequate for 5 years. If the annual traffic is estimated to be 2500 pickup...

  • I need help with question 7.12. I looked at the step-by-step solution for that one but someone posted a comment saying...

    I need help with question 7.12. I looked at the step-by-step solution for that one but someone posted a comment saying that the answer is wrong and no one has commented on what the correct answer should be 201 Problems Determination of ROR 7.7 If a manufacturer of slectronic devices invests S650,000 in equipment for making compact piezo electric accelerometers for general purpose vibra Lion measurement estimate the rate of return from revenue of $225.000 per year for 10 years...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT