If annual overhead costs are expected to be $730000 and direct
labor costs are expected to be $1000000, then if the activity base
is direct labor costs:
a predetermined overhead rate cannot be determined. |
for every dollar of direct labor, 73.0 cents of manufacturing overhead will be assigned. |
$73.0 is the predetermined overhead rate. |
for every dollar of manufacturing overhead, 1.4 cents of direct labor will be assigned. |
Predetermined Overhead rate = Estimated overhead/Estimated total labor cost = 730,000/1,000,000 = 73% It implies, for every $1 of direct labor, $0.73 of manufacturing overhead will be incurred. |
||
Option B is the answer |
If annual overhead costs are expected to be $730000 and direct labor costs are expected to...
11. Which one of the following is an important feature of a job order cost system? A) Each job must be completed before a new product order is accepted. order cost system B) Each job consists of features which distinguish it from the next. C) Each job uses similar processes to produce. D) Each job has characteristics similar to the next. 12. Into which one of the following accounts would the work of factory employees that can be physically and...
A company expected its annual overhead costs to be $900,000 and direct labor costs to be $1,000,000. Actual overhead was $870,000, and actual labor costs totaled $1,100,000. How much is the company's predetermined overhead rate to the nearest cent? $0.87 $0.82 $0.79 $0.90
A company expected its annual overhead costs to be $15,000 and direct labor costs to be $10,000. Actual overhead was $14,000, and actual labor costs totaled $11,000. Calculate predetermined overhead rate, amount of applied overhead and state whether it results in under applied or over applied.
Multiple Choice Question 81 A company expected its annual overhead costs to be $1400000 and direct labor costs to be $1000000. Actual overhead was $1350000, and actual labor costs totaled $1100000. How much is the company's predetermined overhead rate to the nearest cent? O $1.35 $1.27 O $1.23 $1.40 Click if you would like to Show Work for this question: Open Show Work
A company expected its annual overhead costs to be $20,000 and direct labor hours to be 10,000. Actual overhead was $25,000, and actual labor hours totaled 12,000. Calculate predetermined overhead rate, amount of applied overhead and state whether it results in under applied or over applied.
A company expected its annual overhead costs to be $40,000 and direct labor hours to be 20,000. Actual overhead was $38,000, and actual labor hours totaled 18,000. Calculate predetermined overhead rate, amount of applied overhead and state whether it results in under applied or over applied.
Marquis Company estimates that annual manufacturing overhead costs will be $915,560. Estimated annual operating activity bases are direct labor cost $487,000, direct labor hours 48,700, and machine hours 97,400. Compute the predetermined overhead rate for each activity base. (Round answers to 2 decimal places, e.g. 10.50% or 10.50.) Overhead rate per direct labor cost enter percentages rounded to 2 decimal places % Overhead rate per direct labor hour $enter a dollar amount rounded to 2 decimal places Overhead rate per...
Marquis Company estimates that annual manufacturing overhead costs will be $801,960. Estimated annual operating activity bases are direct labor cost $489,000, direct labor hours 48,900, and machine hours 97,800. Compute the predetermined overhead rate for each activity base. (Round answers to 2 decimal places, e.g. 10.50% or 10.50.) Overhead rate per direct labor cost enter percentages rounded to 2 decimal places % Overhead rate per direct labor hour $enter a dollar amount rounded to 2 decimal places Overhead rate per...
Coronado Company estimates that annual manufacturing overhead costs will be $828,000. Estimated annual operating activity bases are direct labor cost $450,000, direct labor hours 45,000, and machine hours 90,000. Compute the predetermined overhead rate for each activity base. Brief Exercise 15-06 Coronado Company estimates that annual manufacturing overhead costs will be $828,000. Estimated annual operating activity bases are direct labor cost $450,000, direct labor hours 45,000, and machine hours 90,000. Compute the predetermined overhead rate for each activity base. (Round...
Question 7 Marquis Company estimates that annual manufacturing overhead costs will be $800,000. Estimated annual operating activity bases are as follows: direct labour cost $500,000, direct labour hours 50,000, and machine hours 100,000. Compute the predetermined overhead rates for each activity base. a) The pre-determined overhead rate using Direct Labour Cost as the activity is ______ % b) The pre-determined overhead rate using Direct Labour Hours as the activity is $ _______ per direct labour hours. c) The pre-determined overhead...