1. | Activity Cost pool | Type of Activity | |||||
Machine-related costs | Machine hours | ||||||
Setup and inspection | No. of production runs | ||||||
Engineering | Engineering change orders | ||||||
Plant-related costs | Square footage of space | ||||||
2. | Activity Cost pool | ||||||
Machine-related costs | $50 | Per machine hour | (450,000/9,000) | ||||
Setup and inspection | $4,500 | Per run | (180,000/40) | ||||
Engineering | $900 | Per change order | (90,000/100) | ||||
Plant-related costs | $50 | per square foot | (96,000/1,920) | ||||
calculations | |||||||
3. | Total overhead Odds | Per unit (Odds) | Ends | Per unit (Ends) | Odds | Ends | |
Machine-related costs | $200,000 | $200.00 | $250,000 | $50.00 | (50*4000) | (50*5000) | |
Setup and inspection | $90,000 | $90.00 | $90,000 | $18.00 | (1000/50*4500) | (5000/250*4500) | |
Engineering | $67,500 | $67.50 | $22,500 | $4.50 | (100*3/4*900) | (100*1/4*900) | |
Plant-related costs | $76,800 | $76.80 | $19,200 | $3.84 | (1920*80%*50) | (1920*20%*50) | |
$434,300 | $434.30 | $381,700 | $76.34 | ||||
4 | Odds | Ends | |||||
Direct materials | $40.00 | $60.00 | |||||
Direct labor | $30.00 | $45.00 | |||||
Overhead | $434.30 | $76.34 | |||||
$504.30 | $181.34 | ||||||
5. | New target price | $605.16 | $217.61 | ||||
(504.30*120%) | (181.34*120%) | ||||||
Required information [The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products:...
Required information [The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products: Odds and Ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Odds $ Production quantity Direct material Direct labor (not including setup time) Manufacturing overhead 40 20 (2 hr. at $15) 96 (2 hr. at $48) 166 Ends 5,000 units $ 60 15 (3 hr. at $15) 144 (3 hr. at $48) $...
[The following information applies to the questions displayed below.] Knickknack, Inc. manufactures two products: Odds and Ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Odds Ends Production quantity 1,000 units 5,000 units Direct material $ 40 $ 60 Direct labor (not including setup time) 30 (2 hr. at $15) 45 (3 hr. at $15) Manufacturing overhead 96 (2 hr. at $48) 144 (3 hr. at $48) Total cost...
Knickknack, Inc. manufactures two products: Odds and Ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Production quantity Direct material Direct labor (not including setup time) Manufacturing overhead Total cost per unit Odds 1,000 units $ 40 30 (2 hr. at $15) 96 (2 hr. at $48) $ 166 Ends 5,000 units $ 60 45 (3 hr. at $15) 144 (3 hr. at $48) $ 249 Manufacturing overhead budget:...
Required information The following information applies to the questions displayed below.] Kitchen King's Toledo plant manufactures three product lines, all multi-burner, ceramic cook tops. The plant's three product models are the Regular (REG), the Advanced (ADV), and the Gourmet (GMT). Until recently, the plant used a job- order product-costing system, with manufacturing overhead applied on the basis of direct-labor hours. The following table displays the basic data upon which the traditional costing system was based REG ADV GMT Planned annual...
Check my work Required information The following information applies to the questions displayed below.) Part 1 of 5 128 Kitchen King's Toledo plant manufactures three product lines, all multi-burner, ceramic cook tops. The plant's three product models are the Regular (REG), the Advanced (ADV), and the Gourmet (GMT). Until recently, the plant used a job-order product-costing system, with manufacturing overhead applied on the basis of direct-labor hours. The following table displays the basic data upon which the traditional costing system...
Required information The following information applies to the questions displayed below.] Kitchen King's Toledo plant manufactures three product lines, all multi-burner, ceramic cook tops. The plant's three product models are the Regular (REG), the Advanced (ADV), and the Gourmet (GMT). Until recently, the plant used a job- order product-costing system, with manufacturing overhead applied on the basis of direct-labor hours. The following table displays the basic data upon which the traditional costing system was based REG ADV GMT Planned annual...
[The following information applies to the questions displayed below. Kitchen King's Toledo plant manufactures three product lines, all multi-burner, ceramic cook tops. The plant's three product models are the Regular (REG), the Advanced (ADV). and the Gourmet (GMT). Until recently, the plant used a job- order product-costing system, with manufacturing overhead applied on the basis of direct-labor hours. The following table displays the basic data upon which the traditional costing system was based. $171 (9 hrs. $19 per hr.) $2e9...
Required information [The following information applies to the questions displayed below.] Rustafson Corporation is a diversified manufacturer of consumer goods. The company's activity-based costing system has the following seven activity cost pools: Activity Cost Pool Estimated Overhead Cost Expected Activity Labor-related $ 28,000 5,000 direct labor-hours Machine-related $ 2,500 5,000 machine-hours Machine setups $ 34,300 700 setups Production orders $ 13,800 300 orders Product testing $ 12,000 600 tests Packaging $ 57,000 3,800 packages General factory $ 60,000 5,000 direct...
Required information [The following information applies to the questions displayed below.) Rustafson Corporation is a diversified manufacturer of consumer goods. The company's activity-based costing system has the following seven activity cost pools: Activity Cost Pool Labor-related Machine-related Machine setups Production orders Product testing Packaging General factory Estimated Overhead Cost $ 18,400 $ 5,000 $ 46,800 $ 23,000 $ 27,200 $ 39,600 $ 51,600 Expected Activity 2,000 direct labor-hours 10,000 machine-hours 1,200 setups 500 orders 800 tests 3,600 packages 2,000 direct...
Required information The following information applies to the questions displayed below.) Rustafson Corporation is a diversified manufacturer of consumer goods. The company's activity-based costing system has the following seven activity cost pools: Activity Cost Pool Labor-related Machine-related Machine setups Production orders Product testing Packaging General factory Estimated Overhead Cost $ 26,800 $ 4,500 $ 41,800 $ 17,000 $ 15,500 $ 51,000 $ 52,400 Expected Activity 5,000 direct labor-hours 9,000 machine-hours 1,100 setups 500 orders 500 tests 3,400 packages 5,000 direct...