Question

Widget Manufacturer A plant produces several related models of widgets. Production of each model involves the same machinery.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

1a Unit Level

b Batch Level

c Batch Level

d Unit Level

e Product Sustaining

f Unit Level

g Unit Level

h Organization Sustaining

i Product Sustaining

j Organization Sustaining

k Product Sustaining

2 The models are mis-costed because equal amount of costs are being reported by the organisation whereas the complex model is being given a lot more time than the simple model. The simple model is over-costed and has costs lower than what is reported whereas the complex model is under-costed and has costs which are higher than what is reported. The engineering costing by the company should be done on the basis of time spent by the engineering department on the respective models and not equally.

Add a comment
Know the answer?
Add Answer to:
Widget Manufacturer A plant produces several related models of widgets. Production of each model involves the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Roberta​, ​Inc., manufactures elliptical machines for several​ well-known companies. The machines differ significantly in their complexity...

    Roberta​, ​Inc., manufactures elliptical machines for several​ well-known companies. The machines differ significantly in their complexity and their manufacturing batch sizes. The following costs were incurred in 2017: Requirement 1. Classify each of the preceding costs as output​ unit-level, batch-level,​ product-sustaining, or​ facility-sustaining. Explain each answer (answer options are in bold on the cost-type row pick one). Cost Item Cost Type a. Indirect manufacturing labor costs such as supervision that supports direct manufacturing​ labor, $935,000 (Batch Level, Facility-sustaining, Output unit-level,...

  • Challenger Factory produces two similar products - regular widgets and deluxe widgets. The total plant overhead...

    Challenger Factory produces two similar products - regular widgets and deluxe widgets. The total plant overhead budget is $625,400 with 369,500 estimated direct labor hours. It is further estimated that deluxe widget production will need 3 direct labor hours for each unit and regular widget production will require 5 direct labor hours for each unit. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will Challenger Factory allocate to regular...

  • Challenger Factory produces two similar products - regular widgets and deluxe widgets. The total plant overhead...

    Challenger Factory produces two similar products - regular widgets and deluxe widgets. The total plant overhead budget is $516,500 with 370,000 estimated direct labor hours. It is further estimated that deluxe widget production will need 5 direct labor hours for each unit and regular widget production will require 6 direct labor hours for each unit. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will Challenger Factory allocate to regular...

  • Challenger Factory produces two similar products - regular widgets and deluxe widgets. The total plant overhead...

    Challenger Factory produces two similar products - regular widgets and deluxe widgets. The total plant overhead budget is $566,800 with 383,800 estimated direct labor hours. It is further estimated that deluxe widget production will need 5 direct labor hours for each unit and regular widget production will require 4 direct labor hours for each unit. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will Challenger Factory allocate to regular...

  • Challenger Factory produces two similar products - regular widgets and deluxe widgets. The total plant overhead...

    Challenger Factory produces two similar products - regular widgets and deluxe widgets. The total plant overhead budget is $537,800 with 334,900 estimated direct labor hours. It is further estimated that deluxe widget production will need 2 direct labor hours for each unit and regular widget production will require 2 direct labor hours for each unit. Using the single plantwide factory overhead rate with an allocation base of direct labor hours, how much factory overhead will Challenger Factory allocate to regular...

  • Uffice Best Products produces a variety of office products including two models (standard and deluxe) of...

    Uffice Best Products produces a variety of office products including two models (standard and deluxe) of a hand-held stapler. A number of the company's activity related costs are described in the following table: UNIT- BATCH- PRODUCT FACILITY- LEVEL LEVEL LEVEL LEVEL DESCRIPTION OF COST Factory depreciation Direct materials Costs of ordering materials for the standard stapler product Engineering support costs Salary of the company CEO Direct labor Costs associated with setting up the machinery to produce a run of the...

  • Roberta, Inc., manufactures elliptical machines for several well-known companies. The machines differ significantly in their complexity...

    Roberta, Inc., manufactures elliptical machines for several well-known companies. The machines differ significantly in their complexity and their manufacturing batch sizes. The following costs were incurred in 2017: (Click the icon to view the costs.) Read the requirements. - X Х i Requirements 1. Classify each of the preceding costs as output unit-level, batch-level, product-sustaining, or facility-sustaining. Explain each answer. 2. Consider two types of elliptical machines made by Roberta, Inc. One machine, designed for professional use, is complex to...

  • amherst metal works ABC systems commonly use a cost hierarchy with four levels to identify cost-allocation...

    amherst metal works ABC systems commonly use a cost hierarchy with four levels to identify cost-allocation bases that are cost drivers of the activity cost pools: (1) Output unit-level costs: the costs of activity performed on each individual unit of a product or service. (2) Batch-level costs: the costs of activities related to a group of units of a product or service. (3) Product-sustaining costs (service-sustaining costs): the costs of activities undertaken to support individual products or services, regardless of...

  • Duration-Based Costing Gee Manufacturing produces two models of camshafts used in the production of automobile engines:...

    Duration-Based Costing Gee Manufacturing produces two models of camshafts used in the production of automobile engines: Regular and High Performance. Gee currently uses an ABC system to assign costs to the two products. For the coming year, the company has the following overhead activities, costs, and activity drivers: Activity Expected Cost Activity Driver Activity Capacity Setups Machining Moving Total OH $214,612 $420,000 $112,500 $747,112 Setup hours Machine hours Move hours 10,000 20,000 5,000 At practical capacity, the expected activity demands...

  • Howrley-David, Inc., manufactures two models of motorcycles: the Fatboy and the Screamer. Both models are assembled...

    Howrley-David, Inc., manufactures two models of motorcycles: the Fatboy and the Screamer. Both models are assembled in the same plant and require the same assembling operations. The difference between the models is the cost of materials. The following data are available for August: Fatboy 780 2,600 Screamer 1,560 $ 3,600 2.340 $ Number of units assembled Materials cost per unit Other costs: Direct labor Indirect materials Other overhead $2,106,000 351,000 1,053,000 Required: Howrley-David uses operations costing and assigns conversion costs...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT