Question

Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...

Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 64 units. The process time for each step is as follows:

Process Step 1 7 minutes
Process Step 2 5 minutes
Process Step 3 4 minutes
Process Step 4 9 minutes

The time required to move each batch between steps is 14 minutes. In addition, the time to move raw materials to Process Step 1 is also 14 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 14 minutes.

The new lean layout will allow the company to reduce the batch sizes from 64 units to 4 units. The time required to move each batch between steps and the inventory locations will be reduced to 2 minutes. The processing time in each step will stay the same.

Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Ans: Present Approach:

1, Value added time:( process time step 1+ process time step 2+ process time step 3+ process time step 4

=(7 mins+ 5 mins+ 4 mins+ 9 mins)

=(25 mins)

2.Non value added= total within batch time + move time

= ( total time required for the 4 steps* (batch size-1)+ move time

= (25 mis*(64-1)+39

=(25*63+39)

=( 1614 min)

3. total lead time= value time+ non value time

=25 mins+ 1614 mins

= (1639 mins)

4. Value added ratio= Value added time/ lead time

= 25 mins/ 1639 mins

= 1.53 mins

Proposed approach:

1. Value added time= ( process time step 1+ process time step 2+ process time step 3+ process time step 4

=(7+5+4+9)

=25 mins

2. Non value added time= total within batch time + move time

=( 7+5+4+9)*(4-1)+28

=(25*3+28)= 103 mins

3 total lead time= ( value added time+ non value added time)

( 103+25)

128 mins

4. Value added ratio= value added time/ total lead time

=25 /128 mins

= ( 19.53 %)

Add a comment
Know the answer?
Add Answer to:
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT