Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 61 units. The process time for each step is as follows:
Process Step 1 | 6 | minutes |
Process Step 2 | 8 | minutes |
Process Step 3 | 5 | minutes |
Process Step 4 | 4 | minutes |
The time required to move each batch between steps is 15 minutes. In addition, the time to move raw materials to Process Step 1 is also 15 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 15 minutes.
The new lean layout will allow the company to reduce the batch sizes from 61 units to 4 units. The time required to move each batch between steps and the inventory locations will be reduced to 3 minutes. The processing time in each step will stay the same.
Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place.
Present Approach | Proposed Approach | |||
Value-added time | min | min | ||
Non-value-added time | min | min | ||
Total lead time | min | min | ||
Value-added ratio (as a percent) | % | % |
ANSWER:
As per the given Question
Present Approach
Value added time = Process time Step 1 + Process time Step 2 + Process time Step 3 + Process time Step 4
= 6 + 9 + 4 + 8 = 27 minutes
Non-value added time = Total within batch wait time + Move time
= [Total time required for four steps *(Batch size -1)] + Move time
= [27 * (70-1)] + 60 mins
= 1,923 minutes
Total lead time = Value added time + Non-value added time
= 27 + 1,923 = 1,950 minutes
Value added ratio = Value added time / Total lead time
= 27 / 1,950 = 1.4%
Proposed Approach
Value added time = Process time Step 1 + Process time Step 2 + Process time Step 3 + Process time Step 4
= 6 + 9 + 4 + 8 = 27 minutes
Non-value added time = Total within batch wait time + Move time
= [Total time required for four steps *(Batch size -1)] + Move time
= [27 * (4-1)] + 10 mins
= 91 mins
Total lead time = Value added time + Non-value added time
= 27 + 91 = 118 mins
Value added ratio = Value added time / Total lead time
= 27 / 118 = 22.9%
Thank you for given Question......kindly rate.......it helps me a lot
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows: Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials to Process Step...
Compute Lead Time Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows: Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials...
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 64 units. The process time for each step is as follows: Process Step 1 7 minutes Process Step 2 5 minutes Process Step 3 4 minutes Process Step 4 9 minutes The time required to move each batch between steps is 14 minutes. In addition, the time to move raw materials to Process Step...
Calculate Lead Time Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows: Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials...
Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 60 parts. A part requires 3 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The...
Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 70 parts. A part requires 2 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The...
Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 80 parts. A part requires 3 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and...
Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 50 parts. A part requires 3 minutes in milling and 9 minutes in finishing. The move time between the two operations for a complete batch is 10 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and...
Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 40 parts. A part requires 6 minutes in milling and 8 minutes in finishing. The move time between the two operations for a complete batch is 5 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and...
Calculate Lead Time Michigan Machining Company machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 50 parts. A part requires 4 minutes in milling and 10 minutes in finishing. The move time between the two operations for a complete batch is 11 minutes. Under the lean manufacturing philosophy, the part is produced in a cell that includes both the milling...