from given data:
sample | xbar | R |
1 | 344 | 3 |
2 | 346 | 4 |
3 | 355 | 3 |
4 | 353 | 2 |
5 | 354 | 3 |
average | 350.4 | 3 |
for Xbar chart:
sample mean x̅ = | 350.4 | ||||
average range R̅ = | 3 | ||||
sample size n = | 8 | ||||
for sample size n=8, criitcal value of constant A2= | 0.373 | ||||
control line (CL) = x̅= | 350.4 | ||||
upper control limit =x̅+3*A2R̅ = | 351.519 | ||||
lower control limit =x̅-3*A2R̅ = | 349.281 |
for R chart:
average range R̅ = | 3 | ||||
sample size n = | 8 | ||||
for sample size n=8, criitcal value of constant D3= | 0.136 | ||||
for sample size n=8, criitcal value of constant D4= | 1.864 | ||||
control line (CL) = R̅= | 3 | ||||
upper control limit (UCL)=D4R̅ = | 5.592 | ||||
lower control limit(LCL) =D3R̅ = | 0.408 |
A manufacturer trying to get a process under control randomly collects 8 samples from the process...
A manufacturer trying to get a process under control randomly collects 4 samples from the process each hour. Five of the X bar and R measurements are as follows: X bar: 374, 376, 360, 359, 369 R: 3, 2, 5, 2, 3 What are the control limit values for the two control charts (3 per chart)?
A district manager is responsible for a region with a number of retail stores of similar size and similar expenses. The manager randomly selects the petty cash disbursement reports for 4 random)y selected stores for each of the last 20 months and notes the amount of the disbursement. The following are the disbursement data in dollars. Construct control charts that can be used to monitor petty cash disbursements by the stores in her district. Week Expenses 319 336 312 350278...
The manager of an assembly line took five samples each with six observations, under ideal conditions to develop control limits for an X-bar chart and R-chart. The mean and the range for each sample is shown in the table below. Sample Number Sample Mean Sample Range 1 2.18 0.33 2 2.12 0.38 3 1.88 0.44 4 1.99 0.38 5 2.02 0.32 Calculate the UCL and LCL for the X-bar Chart and...
Problem no.3 The thickness of a metal part is the quality characteristic that statistical process control is being applied to. Measurements are taken from 25 subgroups of subgroup size 5. The sum of the X-bar values 1.5735. The sum of the R-values .0231. Xbar/R Chart for x 0636 06396 Subgroup 10 15 20 25 001 0011 a.) Calculate the trial control limits and centerlines for the X-bar and R charts above b.) Calculate the revised control limits and centerlines for...
1. What is the UCL for the XBar chart based on the data below, with n=4, and ten set of samples for the weight of soft drinks are given. USL for the product is 355 g and LSL is 345. Daily production is 15000 units. Sample # Observations 1 352 348 350 351 2 351 352 351 350 3 351 346 342 350 4 349 353 352 352 5 351 350 351 351 6 353 351 346 346 7 348...
4. (5 Points) Control charts are to be kept on the thickness measurements for the process that produces steel tubing. The current specifications on the tubing are 0.1340 +0.0010 inch. After collecting 25 rational samples of size n 4 measurements at approxi half-hour intervals, the data were used to determine the sum of sample averages as 4.014 inches and the sum of sample ranges as 0.027 inch. Using X-bar and R control charts the process was declared in-control. Assume that...
Samples of n = 6 items each are taken from a process at regular intervals. A quality characteristic is measured, and x-bar and R values are calculated for each sample. After 50 samples, we have Compute control limits for the x-bar and R control charts. All points on both control charts fall between the control limits computed in part (a). What are the natural tolerance limits of the process? If the specification limits are 41 ± 5.0, what are your...
Control A speaker manufacturer molds kevlar woofer surro surrounds are randomly sampled each five minutes, measured, and the average and range for each unds for use in 6.5 woofers. Samples of 7 woofer sample is computed. The following data represent the summary statistics for the most recent 14 Sample Mean 6.49* 6.47 6.49 6.51 6.50 6.46 6.47 6.52 6.51 6.48 6.49 6.50 6.52 6.46 Range 0.05. 0.03 0.07 0.02 0.06 0.08 0.03 0.04 0.07 0.03 0.05 0.03* 0.04 2 6...
8 have been gathered with the following results A services process is monitored using x-bar and R charts. Eight samples of n5 observations Sample 2 4 Mean 7.2 7.4 6.6 6.8 7.9 6.0 7.2 6.2 Range .43 .52 .53 20 .36 .42 .35 .42 7 8 Using this data, compute the centerline, the 3 sd upper control limit, and the lower control limits for the x-bar and R charts X-bar R-bar UCL r-bar LCL r-bar UCL x-bar LCL x-bar a....
The management of the Diners Delight restaurant chain is in the process of establishing quality control charts for the time that its service people give to each customer. Management thinks the length of time that each customer is given should remain within certain limits to enhance service quality. For simplicity, the data from three samples are displayed below. In each sample, four service people were randomly selected, and the customer service they provided was observed. The time (in seconds) to...