Invoice cost | 11000 |
Discount earned | (220) |
Steel mounting | 815 |
Freight costs | 280 |
Assembly | 405 |
Raw materials for testing | 140 |
Total acquisition costs | 12420 |
Dalton Company purchased a machine for $11,000 terms 2/10, 1/60, FOB shipping point. The seller prepaid...
Dalton Company purchased a machine for $12,000, terms 1/10, n/60, FOB shipping point. The seller prepaid the freight charges, $290, and sent a second invoice for the freight. Dalton took advantage of the discount on the first invoice, but the discount was not available on the freight invoice. The machine required a special steel mounting and power connections costing $825, and another $420 was paid to assemble the machine and get it into operation. In moving the machine onto its...
Rizio Co. purchases a machine for $9,800, terms 1/10, n/60, FOB shipping point. The seller prepaid the $221 freight charges, adding the amount to the invoice and bringing its total to $10,021. The machine requires special steel mounting and power connections costing $677. Another $319 is paid to assemble the machine and get it into operation. In moving the machine to its steel mounting, $305 in damages occurred. Materials costing $40 are used in adjusting the machine to produce a...
Rizio Co. purchases a machine for $14,300, terms 1/10, n/60, FOB
shipping point. The seller prepaid the $323 freight charges, adding
the amount to the invoice and bringing its total to $14,623. The
machine requires special steel mounting and power connections
costing $989. Another $466 is paid to assemble the machine and get
it into operation. In moving the machine to its steel mounting,
$350 in damages occurred. Materials costing $40 are used in
adjusting the machine to produce a...
Rizio Co purchases a machine for $13,800, terms 1/10. n/60, FOB shipping point. The seller prepaid the $312 freight charges, adding the amount to the invoice and bringing its total to $14.112. The machine requires speci $954. Another $450 is paid to assemble the machine and get it into operation. In moving the machine to its steel mounting. $365 in damages occurred. Materials costing $40 are used in adjusting the machine to produce a satisfactory product. The adjustments are normal...
Rizio Co. purchases a machine for $11,600, terms 2/10, n/60, FOB shipping point. The seller prepaid the $262 freight charges, adding the amount to the invoice and bringing its total to $11,862. The machine requires special steel mounting and power connections costing $802. Another $378 is paid to assemble the machine and get it into operation. In moving the machine to its steel mounting, $275 in damages occurred. Materials costing $40 are used in adjusting the machine to produce a...
10 Rizio Co. purchases a machine for $13,600, terms 2/10, n/60, FOB shipping point. The seller prepaid the $307 freight charges, adding the amount to the invoice and bringing its total to $13.907. The machine requires special steel mounting and power connections costing $940. Another $443 is paid to assemble the machine and get it into operation. In moving the machine to its steel mounting $260 in damages occurred. Materials costing $40 are used in adjusting the machine to produce...
Edmonton Ice Rink purchased a Zamboni ice-resurfacing machine for $21,000, terms 2/10, n/60, FOB shipping point. Edmonton Ice received a freight invoice from On-time Delivery for $380. Edmonton Ice took advantage of the discount. The Zamboni required a special steel mounting and power connections costing $915, and another $555 was paid to paint the home team colours on the Zamboni and get it into operation. In moving the Zamboni onto its steel mounting, it was banged and damaged. The repairs...
Rizio Co. purchases a machine for $10,900, terms 2/10, n/60, FOB shipping point. Rizio paid within the discount period and took the $218 discount. Transportation costs of $246 were paid by Rizio. The machine required mounting and power connections costing $754. Another $355 is paid to assemble the machine and $40 of materials are used to get it into operation. During installation, the machine was damaged and $225 worth of repairs were made. Complete the below table to calculate the...
Rizio Co. purchases a machine for $14,900, terms 2/10, n/60, FOB shipping point. Rizio paid within the discount period and took the $298 discount. Transportation costs of $337 were paid by Rizio. The machine required mounting and power connections costing $1,030. Another $486 is paid to assemble the machine and $40 of materials are used to get it into operation. During installation, the machine was damaged and $375 worth of repairs were made. Complete the below table to calculate the...
Rizio Co. purchases a machine for $11,600, terms 2/10,n/60, FOB shipping point. Rizio paid within the discount period and took the $232 discount. Transportation costs of $262 were paid by Rizio. The machine required mounting and power connections costing $802. Another $378 is paid to assemble the machine and $40 of materials are used to get it into operation. During installation, the machine was damaged and $370 worth of repairs were made. Complete the below table to calculate the cost...